Laserfiche WebLink
the County Dark Fibers and the County Equipment, in a way that interferes in any way with or <br />adversely affects the use of the ZAYO System or any Cable therein or other equipment and <br />facilities of any Person (including ZAYO) using the ZAYO System. County's facilities, <br />including without limitation the County Dark Fibers and the County Equipment, shall not <br />endanger or damage the ZAYO System and shall not create an unreasonable risk of damage to <br />property or injury or death to any individual or to the public. County acknowledges that the <br />ZAYO System includes or will include other participants, including ZAYO and other owners and <br />users of telecommunications systems. <br />8.3 Periodic Inspection. Up to the Demarcation Point on the Network Side, ZAYO <br />shall have the right, but not the duty, to make periodic or spot inspections of, to be present at, <br />and to monitor any access to or work by County relating to any County Manholes and County <br />Handholes. Such inspections and monitoring maybe conducted for the purpose of determining <br />whether facilities placed in the County Manholes or County Handholes and work relating thereto <br />are in compliance with the terms of this Agreement. ZAYO may charge County for the Costs of <br />inspection and monitoring only if the inspection or monitoring reflects that County is in <br />substantial non-compliance with the terms of this Agreement. If ZAYO reasonably determines <br />that any work or facilities is not in compliance with the terms of this Agreement, County shall, <br />upon written notice from ZAYO, bring its work and facilities into material compliance within <br />forty-eight (48) hours of such written notice or, at a minimum, commence curative measures <br />within twenty-four (24) hours and exercise reasonable diligence to complete such measures as <br />soon as possible thereafter. If County fails to at least commence corrective measures within <br />twenty-four (24) hours of ZAYO's notice, then ZAYO may take any action it deems appropriate <br />to correct the non-compliance, including directing immediate suspension of work relating to the <br />ZAYO System. Failure of County to bring its work or facilities into compliance as aforesaid <br />shall constitute a material breach under this Agreement. <br />8.4 Health and Safety. If ZAYO, in its reasonable discretion, determines that <br />conditions exist within the ZAYO System that pose an immediate threat of damage to property, <br />injury to or death of any Person, or that a violation exists of any. of the Permits, then ZAYO may <br />direct that all work or use by County or others .relating to the ZAYO System, including the <br />County Dark Fibers, be immediately suspended until the violation or condition is corrected to <br />ZAYO's satisfaction. Neither Party shall be liable for or entitled to any damages for such <br />suspension. If any condition or violation is a direct or indirect result of County's use of the <br />County Dark Fibers or County Equipment, County shall pay and reimburse ZAYO for one <br />hundred percent (100%) of all Costs incurred by ZAYO in taking corrective action within thirty <br />(30) days of the date of ZAYO's invoice therefore. <br />9. Construction Services <br />Notwithstanding anything contained in this Agreement to the contrary, any and all work <br />with respect to the County Dark Fibers and the ZAYO System shall be performed solely by <br />ZAYO with respect to the Initial Service Order. In addition, from time to time, ZAYO may <br />provide construction services ("Construction Services") in :the form of installation of Duct, <br />conduit, Lateral Connection(s), optical fibers,. splicing and testing of such fibers, and <br />construction of manholes and handholes. If County requires a lateral connection to the Zayo <br />System, consistent with Minnesota law, Zayo shall have the right to match any bid by a third <br />party to construct a lateral connection to the Zayo System for any additional locations. Any - - <br />12 <br />Anoka County Master Fiber IRU 8.14.10 <br />