Laserfiche WebLink
JARVIS STREET - 32' ROADWAY WITHOUT TRAIL <br />COST SHARING <br />STA. 79+00 TO STA. 117+00 <br />CITY OF ELK RIVER <br />NO. <br />ITEM UNITS QTY UNIT PRICE TOTAL PRICE <br />QUIET ZONE AT JARVIS IMPROVEMENTS <br />1 PROPOSED CROSSING SURFACE (INCLUDES CONCRETE PANELS, NEW RAIL, TIES, AND BALLAST) LF 80 $1,400.00 $112,000.00 <br />2 PROPOSED SAFETY MEASURE (TWO -QUADRANT GATE SYSTEM WITH FLASHERS & CWT) LUMP SUM 1 $250,000.00 $250,000.00 <br />3 COMMON EXCAVATION CU YD 150 $14.00 $2,100.00 <br />4 AGGREGATE BASE. CLASS 5 TON 80 $28.00 $2,240.00 <br />5 5" CONCRETE WALK SQ FT 1000 $6.00 $6,000.00 <br />6 CONCRETE CURB & GUTTER DESIGN B818 (NON -TRAVERSABLE MEDIAN) LIN FT 320 $18.00 $5,760.00 <br />7 TRUNCATED DOMES SQ FT 80 $42.00 $3,360.00 <br />8 FLAG PERSON (BNSF CROSSING) LUMP SUM 1 $12,500.00 $12,500.00 <br />9 SIGN PANEL TYPE C SO FT 50 $35.00 $1,750.00 <br />10 HYDRAULIC SOIL STABILIZER, TYPE 5, WITH SEED & FERT. SQ YD 500 $2.00 $1,000.00 <br />SUBTOTAL QUIET ZONE COST $396,710.00 <br />10% CONTINGENCIES $39,670.00 <br />TOTAL QUIET ZONE COST $436,380.00 <br />INDIRECT COSTS (10%) $43,670.00 <br />TOTAL QUIET ZONE COST $480,050.00 <br />TOTAL CITY OF RAMSEY QUIET ZONE COST $240,025.00 <br />TOTAL CITY OF RAMSEY COST FOR 32' ROADWAY WITHOUT TRAIL $863,395.50 <br />TOTAL COST INCREASE TO 36' WIDE ROADWAY $56,910.00 <br />TOTAL CITY OF RAMSEY CONTRIBUTION $920,305.50 <br />