My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/10/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 02/10/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:59:46 PM
Creation date
5/14/2015 2:43:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/10/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
881
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Costs for constructing public utilities during this project were considered for the following <br />reasons. First, the City would benefit by constructing watermain as previously noted and <br />recommended by staff. Second, the proposed improvements have an estimated design life of 60 - <br />years and considering that adjacent properties were developed over 20 years ago, they could <br />soon begin to experience failing septic systems or wells meaning residents may want to connect <br />to utilities before the end of the project design life, which would require the street to be <br />reconstructed before its useful life is over. And third, residents may request to connect to City <br />utilities as part of this project to capitalize on significant cost savings offered per the recently <br />adopted Special Assessments Policy. <br />Staff will be seeking Council input on whether plans should be bid with any or all public utilities <br />included in the base bid, whether the plans should be bid with any or all of the public utilities <br />included as an alternate bid, or whether public utilities should be omitted from the plans <br />altogether. Input will be solicited from impacted property owners during the neighborhood <br />information meeting regarding their potential to connect to public utilities. Staff will also make <br />sure that everyone is aware that costs for connecting to utilities during street reconstruction <br />projects will be significantly reduced per the recently adopted Special Assessments Policy. <br />This improvement project, which is listed in the City's current 5 -year Capital Improvement Plan, <br />can be funded using a combination of special assessments to benefiting properties and street <br />reconstruction bond proceeds. Sewer and Water Utility Funds would be used to pay for any of <br />the public utility improvements. <br />Preliminary assessments in the amount of $6,500 per lot are proposed for the 12 single-family <br />residential property owners with direct access onto the improved street segments. Both the <br />method and rate are reflective of the newly adopted Special Assessments Policy, including the <br />fact that assessments are not proposed to be levied for the new sidewalks or any of the subgrade <br />corrections. <br />To ensure that all special assessments levied with this project are commensurate with the benefit <br />received, staff will request Council authorization to order a benefit appraisal consultation based <br />on the current property use at the time the improvements are made. <br />This project is necessary, feasible, and cost-effective from an engineering standpoint, and can be <br />constructed as proposed herein. <br />Feasibility Report <br />Garnet Street and l681" Avenue Reconstruction <br />City of Ramsey Project No. 13-10 <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.