Laserfiche WebLink
PRELIMINARY ENGINEER'S ESTIMATE <br />GARNET STREET RECONSTRUCTION (1,350 LF) <br />NOW THEN ESTATES <br />CITY OF RAMSEY <br />JANUARY 8, 2015 <br />SUMMARY OF STREET CONSTRUCTION COST <br />TOTAL STREET CONSTRUCTION <br />TOTAL STORM SEWER CONSTRUCTION <br />10% CONTINGENCY <br />ENGINEERING (18%) AND ADMINISTRATIVE AND LEGAL (7%) <br />TOTAL ESTIMATED STREET PROJECT COST <br />Prepared by: Bruce Westby, P.E. <br />Proposed Construction Year: 2015 <br />$496,378.68 <br />$106,100.00 <br />$60,247.87 <br />$165,681.64 <br />$828,408.19 <br />SCHEDULE C: SANITARY SEWER <br />UTILITY DEWATERING 1 0 LS $5,000.00 1 $5,000.00 <br />8" PVC SDR 35 1,160 0 LF $45.00 2,000 $52,200.00 <br />4" PVC SDR 26 300 3 LF $30.00 400 $9,000.00 <br />SANITARY MANHOLE W/ FRAME AND CASTING 5 0 EA $3,500.00 9 $17,500.00 <br />CONNECT TO EXISTING 2 0 EA $1,200.00 2 $2,400.00 <br />8" X 4" WYE 10 0 EA $250.00 11 $2,500.00 <br />TELEVISE COMPLETED SANITARY PIPE 1,460 0 LF $1.00 2,400 $1,460.00 <br />SCHEDULE D: WATERMAIN <br />TOTAL SANITARY SEWER CONSTRUCTION $90,060.00 <br />6" WATERMAIN DUCTILE IRON CLASS 53 160 0 LF $50.00 700 $8,000.00 <br />8" WATERMAIN DUCTILE IRON CLASS 52 1,140 0 LF $65.00 1,400 $74,100.00 <br />1" TYPE K COPPER WATERMAIN 300 3 LF $25.00 500 $7,500.00 <br />1" SERVICE GROUP 10 0 EACH $250.00 11 $2,500.00 <br />6" GATE VALVE & BOX 3 0 EACH $1,500.00 1 $4,500.00 <br />8" GATE VALVE & BOX 4 0 EACH $1,800.00 4 $7,200.00 <br />FURNISH & INSTALL HYDRANT 3 0 EACH $4,000.00 6 $12,000.00 <br />WATERMAIN FITTINGS 1,050 0 POUND $6.00 1,500 $6,300.00 <br />4" INSULATION 25 0 SY $35.00 25 $875.00 <br />CONNECT TO EXISTING WM 2 0 EACH $1,250.00 2 $2,500.00 <br />TOTAL WATERMAIN CONSTRUCTION $125,475.00 <br />H:\Cases\CC\2015\1-13-15\Garnet&168thAve Engrs Est Feas Rpt FINAL PDF Page 2 of 6 <br />