Laserfiche WebLink
PRELIMINARY ENGINEER'S ESTIMATE <br />GARNET STREET RECONSTRUCTION (1,350 LF) <br />NOW THEN ESTATES <br />CITY OF RAMSEY <br />JANUARY 8, 2015 <br />SUMMARY OF STREET RECONSTRUCTION WITH UTILITIES <br />Prepared by: Bruce Westby, P.E. <br />Proposed Construction Year: 2015 <br />TOTAL STREET CONSTRUCTION $496,378.68 <br />TOTAL STORM SEWER CONSTRUCTION $106,100.00 <br />TOTAL SANITARY SEWER CONSTRUCTION $90,060.00 <br />TOTAL WATERMAIN CONSTRUCTION $125,475.00 <br />10% CONTINGENCY $81,801.37 <br />ENGINEERING (18%) ADMINISTRATIVE AND LEGAL (7%) $224,953.76 <br />TOTAL ESTIMATED PROJECT COST $1,124,768.81 <br />H:\Cases\CC\2015\1-13-15\Garnet&168thAve Engrs Est Feas Rpt FINAL PDF Page 3 of 6 <br />