My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/24/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 02/24/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:02:10 PM
Creation date
5/14/2015 2:55:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/24/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our Mission: To work together to respasibtyr grow oYU community, and to provide quality, cost-effective, and efficient government services. <br />CC Regular Session 4. 8. <br />Meeting Date: 02/24/2015 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title: <br />Adopt Resolution 15-93-050 Accepting Feasibility Report and Ordering Public Hearing for 2015 Street <br />Maintenance Program Division B, Overlay Improvements; Improvement Project 1t15-00 - Please Note: this <br />Consent case was removed form the agenda and will be considered at the March 10, 2015 City Council Meeting. <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to accept the Feasibility Report and order a Public Hearing for March 10, 2015 for 2015 <br />Street Maintenance Program, Division B; City Improvement Project #15-00. <br />Background: <br />On February 10th, 2015 the Ramsey City Council ordered a feasibility report for Division B of the 2015 Street <br />Maintenance Program, overlay improvements, which has been completed and is attached to this case. The <br />feasibility report addresses the feasibility of overlaying numerous public street segments in four separate areas of <br />the City as part of the City's long-term Street Maintenance Program. <br />The street segments proposed to receive overlays were rated in 2014 using the Pavement and Surface Evaluation <br />Rating (PASER) method. All street segments received ratings of 3 or 4, making them excellent candidates for <br />bituminous pavement overlays. <br />The existing right-of-ways along the street segments proposed to receive overlays as part of this project generally <br />vary in width from 60 to 80 feet. The paved street segments vary in width from 24 to 40 feet. All proposed street <br />segments in this project were constructed with bituminous pavement and curbing, and most of the street segments <br />contain storm sewer systems. The thickness of the bituminous pavement sections vary. <br />Other than casting adjustments, no public utilities improvements are proposed as part of this project. <br />Notification: <br />No notices were required for this case, but notices will be published and mailed for the March 10th Public Hearing <br />if the hearing is ordered. <br />Observations/Alternatives: <br />
The URL can be used to link to this page
Your browser does not support the video tag.