Laserfiche WebLink
During construction, staff will evaluate the construction limits for each driveway and will <br />work with each of property owner to determine the proper overlay limits in the field. <br />Right -of -entry forms may be needed from residential property owners to complete work <br />outside City right-of-ways and easements. <br />Pedestrian Facilities: <br />Pedestrian facilities exist along several of the street segments proposed to receive an <br />overlay. Staff will evaluate potential impacts to each facility in the field to determine <br />whether any adjustments are needed. <br />4.2 Stormwater Improvements <br />No widening of streets is proposed with this project so stormwater improvements are proposed to <br />be limited to casting adjustments of storm sewer structures. <br />4.3 Water Main Improvements <br />No watermain improvements are proposed with this project. <br />4.4 Sanitary Sewer Improvements <br />No sanitary sewer improvements are proposed with this project. <br />4.5 Construction Methods <br />First, all metal castings of sanitary sewer, storm sewer, and watermain infrastructure will be <br />raised and the pavement will be swept to remove loose debris. The existing pavement will then <br />receive a coating of bituminous tack material that serves to join the bituminous overlay to the <br />existing bituminous pavement. Each street will then receive a 11/2" bituminous overlay lift. <br />New pavement striping will then be completed as necessary. <br />4.6 Private Utilities <br />Staff has not yet met with telephone, gas, and/or cable utilities regarding this project. If the City <br />Council orders this project, staff will meet with the private utility companies as noted in the <br />project schedule included in this report to discuss the proposed improvements, and to determine <br />if modifications are feasible to minimize impacts to private utilities, including potential power <br />pole impacts. <br />Should a utility company indicate that they wish to upgrade, replace and/or otherwise modify <br />their services during the project, any such upgrades, replacements and/or modifications will be at <br />the sole discretion and cost of the private utility companies. City staff will contact Xcel Energy <br />to determine if they would like to bury any of their overhead lines with this project. <br />Feasibility Report <br />2015 Street Maintenance Program, Division B: Overlay Improvements <br />City of Ramsey Project No. 15-00 <br />Page 5 <br />