Laserfiche WebLink
4.7 Permits <br />Permits that are anticipated to be required as part of the proposed improvements include: <br />• Anoka County Highway Department Permit Work in Right -of -Way <br />• MPCA General Stormwater Permit (NPDES) Grading and Storm Water <br />4.8 Right-of-Ways/Easements <br />It is anticipated that the vast majority of improvements will occur within existing City right-of- <br />ways and/or easements. However, a small amount of work will likely occur within Anoka <br />County Highway right-of-ways along County State Aid Highway (CSAH) 5/Nowthen Boulevard <br />and CSAH 83/Armstrong Boulevard, on private driveways, and/or when grading back -slopes <br />and/or ditches. However, it is not anticipated that the City will need to acquire any permanent <br />right-of-way or easements for this project. <br />Rights of entries from individual property owners may need to be obtained prior to construction <br />commencing for grading, driveway removals and paving, and restoration activities. <br />Feasibility Report <br />2015 Street Maintenance Program, Division B: Overlay Improvements <br />City of Ramsey Project No. 15-00 <br />Page 6 <br />