My WebLink
|
Help
|
About
|
Sign Out
Home
08/16/93
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Economic Development Commission
>
Agendas
>
1993
>
08/16/93
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2025 2:34:40 PM
Creation date
4/1/2004 1:40:49 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Economic Development Commission
Document Date
08/16/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey <br /> <br />15153 NOWTHEN BOULEVARD N.W.. RAMSEY, <br /> <br /> PHONE (612) 427-1410 <br /> FAX (612) 427-5543 <br />MINNESOTA 55303 · TDD (612) 427-8591 <br /> <br />August 10, 1993 <br /> <br />Mr. Doug Uhrhammer <br />Community Development and Public Affairs <br />Anoka Elecu-ic Cooperative <br />2022 North Ferry Su'eet <br />Anoka, MN 55303 <br /> <br />Re: Site Search <br /> <br />Dear Mr. Uhrhammer: <br /> <br />Thank you for considering the City of Ramsey as a fmalist in the search for a new location of your <br />Cooperative headquarters and service center. As requested in your letter of July 22, 1993, I have <br />provided additional information on the three sites located in the City of Ramsey as follows: <br /> <br />Site .1 <br /> <br />This site is a total of 77.9 acres of buildable property with no protected wetlands located on the <br />property. As Figure A shows, the site is currently served.on two sides by 9-ton county roads. <br />This property is also proposed to be served by McKinley Street N.W., following the proposed <br />alignment on Figure 1. This alignment may be adjusted to fit the needs of the facility. The <br />construction of McKinley Su-eet N.W. is currently scheduled for 1994-95. This road will also be <br />consu-ucted to a 9-ton standard_ <br /> <br />The entire area of Site 1 is currendy located in a Tax Increment Financing (TIF) District. This <br />allows for the City to participate in the cost of certain types of site improvements. The type of <br />improvements which are allowed for Economic Development Authority (lEDA) participation are <br />listed on the Project Financing Guidelines (attached). <br /> <br />In addition to the information shown on Table A, the City has contacted the property owners for <br />this area, and the asking price is currently $10,000 per acre. <br /> <br />Site 2 <br /> <br />This site is a total of 150 acres with approximately 34 &bres being a protected wetland, leaving 115 <br />acres for development. This area was the location of the Gateway North Industrial Airport until <br />1991, so the terrain would require limited site preparation. This site is also served by two, 9-ton <br />roads (Ramsey Boulevard N.W. and County Road #116). '.. <br /> <br />This site is not currently located in a TIF District as shown on Table A. However, the EDA may <br />be able to offer similar assistance for the site preparation work and other improvements listed in the <br />attached Project Financing Guidelines. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.