My WebLink
|
Help
|
About
|
Sign Out
Home
02/23/93
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Finance Committee
>
Agendas
>
1990's
>
1993
>
02/23/93
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2025 2:43:06 PM
Creation date
4/2/2004 7:41:12 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Finance Committee
Document Date
02/23/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.4 <br /> <br />2.5 <br /> <br />2.6 <br /> <br />2.7 <br /> <br />2.8 <br /> <br />2.9 <br /> <br />1121~1 <br /> <br />directness of travel, accessibility, functional classification and <br />natural constraints such as wetlands: Give special consideration to <br />alignment, access, and classification issues in the TH l0 corridor. <br />Write policies that amend or supplement those on pages 61-69a of <br />the 1980 Comprehensive Plan. This task will be cooi'dinated with <br />Task 1.5, Recommend Revisions to the Land Use Plan Map and <br />Task 1.6, Recommend Revisions to the Land Use Plan Policies. <br />.Plans will be consistent with Metropolitan Council policies to the <br />extent that the City is in agreement with those policies. <br /> <br />p~epare Trail System Plan <br /> <br />Using a map supplied by the City, prepare a map that illustrates the <br />locations of existing and previously-planned bicycle and pedestrian <br />trails. Prepare a plan and policies for trail locations and design <br />standards with emphasis on connecting neighborhoods to shopping, <br />schools, parks and bus stops. <br /> <br />Review with City Staff <br /> <br />Review results of.Tasks 2.1 to 2.5 with City staff. Make necessary <br />revisions and improvements to the draft road system, transit, and <br /> · <br />trail plans. <br /> <br /> ¢ <br /> <br />Review with Planning Commission <br /> <br />Review the results of Tasks 2.1 through 2.7 with the Planning and <br />Zoning Commission and members of the public at up to two <br />meetings. These two meetings are the same as those described in <br />Task I. 12 of the Comprehensive Land Use Planning Element of the <br />proposal. <br /> <br />Revise Drafts <br /> <br />Revise Draft Comprehensive Road System Plan based on comments <br />received from the Planning and Zoning Commission and inpUt from <br />the public. This task is consistent with Task 1.13. <br /> <br />Revibw with City Council <br /> <br />Review the recommendations with the City Council. <br /> <br />.Respond to the Metropolitan Council <br /> <br />For the sake of budget efficiency, we request that the City staff <br />prepare the Major Comprehensive Plan Amendment submittal to <br /> <br />5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.