Laserfiche WebLink
2.10 <br /> <br />3.0 <br /> <br />3.1 <br /> <br />the Metropolitan Council. BRW will respond to the review of the <br />Metropolitan Council and revise the draft plans following the <br />direction of the City Administrator. The revised plan can then be <br />resubmitted to the City Council for final approval. <br /> <br />Prepare Final Draft <br /> <br />Prepare final text that is compatible in appearance with the existing <br />plan text so that it can be inserted for future copying. <br /> <br />SURFACE WATER MANAGEMENT PLAN <br />UPDATE <br /> <br />Physical Environment <br /> <br />3.1.1 <br /> <br />3.1.2 <br /> <br />3.1.3 <br /> <br />3.1.4 <br /> <br />3.1.5 <br /> <br />City Base Map <br /> <br />Prepare AutoCAD (Version 12) base map of City from City <br />supplied map. The base map will include City boundaries, street <br />fights-of-way, property boundaries and major land features. <br /> <br />Soils Map <br /> <br />Review and update existing soils map and prepare AutoCAD <br />overlay of City base map depicting soil types. <br /> <br />Furore Land Use Map <br /> <br />Prepare AutoCAD overlay of City base map showing Future Land <br />Use Plan as determined by Comprehensive Plan update. <br /> <br />Drainage Divides <br /> <br />Review and update watershed divides identified in the 1980 <br />Comprehensive Storm Drainage Plan and define watershed divides <br />for remaining areas within the City boundaries (Trout Brook <br />Watershed on the north and Lake Itasca Watershed on the west). <br />Prepare AutoCAD overlay of City base map identifying the <br />watershed divides. <br /> <br />Hydrologic Parameters <br /> <br />Prepare tabulation for each watershed identifying land use and soil <br />types by area and providing SCS runoff coefficients for hydrologic <br />and water quality models. <br /> <br />112138 <br /> <br /> <br />