My WebLink
|
Help
|
About
|
Sign Out
Home
04/27/93
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Finance Committee
>
Agendas
>
1990's
>
1993
>
04/27/93
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2025 2:48:11 PM
Creation date
4/2/2004 7:47:12 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Finance Committee
Document Date
04/27/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRIORITY CRITERIA <br /> <br />The degree to which the proposed project fulfills the intent of the ISTEA. <br /> <br />The County Road //116 alternative transportation corridor represents the <br />very essence of the intent and goals of ISTEA. <br /> <br />Both the Cities Anoka and Ramsey have been progressive leaders in planning and <br />implementing bikeways and walkways. This project with its improved transportation, <br />enhanced safety, and beautification elements fulfills the alternative transportation needs of <br />this growing area by providing the critical link to the existing significant capital <br />expenditures. <br /> <br />This quality enhancement project will: <br /> <br />Promote energy efficiency by reductions in single occupant vehicles and further <br />promotion of economical and sustainable travel. <br /> <br />Encourage and facilitate economic competitiveness by reducing the expenses <br />of local travel, thereby fostering sustainable growth and employment and <br />encouraging continued educ,'ttional pursuits. <br /> <br />Enhance and sustain environmental quality by reducing adverse environmental <br />effects associated with increasing vehicular traffic and provide enhancements of <br />aesthetics as well as ecological continuity through diverse landscaping of Highway <br />/ti 16's view shed. <br /> <br />By maintaining mobility, creating jobs, and enhancing the integrity of the local <br />communities, the beneficiaries of this project, the Northwest Metropolitan Area, <br />will be effective and viable participants in the national economy. <br /> <br />Funding of this project results in a comprehensive and complete on and off road <br />bikeway/walkway system comprising of 25.6 miles. The project cost includes a <br />contribution from the ISTEA in the amount of $113,244 and a local contribution in the <br />amount of $113,244. This results in a project cost per mile from ISTEA of $43,555. <br />Further, the entire project cost of $226,488 completes the 25.6 mile system at a cost of less <br />than $8,900 per mile. <br /> <br />This completed bikeway/walkway system will run adjacent to a Minnesota Department of <br />Natural Resources Type 3 protected wetland (Grass Lake) which will enhance the use and <br />visual appreciation of this nature area. For persons using this segment of off roadway <br />transportation system, including those traversing between residential neighborhoods and an <br />elementary school, between residential areas, between a residential area, a high school and <br />commercial area, and between two commercial areas, this portion of the 'trail system is the <br />most direct route which can be used between these destinations. The entire ,25,6 mile <br />bikeway/walkway project, including present components and ISTEA funded <br />components, improves the utilization and viability of several commercial, <br />industrial and residential areas. <br /> <br />Projects with components which have already been funded and/or <br />implemented from other funding sources, especially projects for which the <br />proposed Enhancements funded element would complete a larger project, <br />concept, or plan. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.