My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 07/12/1993
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
1993
>
Agenda - Parks and Recreation Commission - 07/12/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 12:17:11 PM
Creation date
4/2/2004 8:48:29 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
07/12/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~roject g6 . Xkimo Street <br /> <br />i'lfis street will b¢ the north/south collector east of Trunk Highway ~.47 in the River*s Bend <br />subdivision. It will provide local residential traffic to its east and commercial n-affic on the west <br />side of the roadway. It is projected as a 1993 project but will occur simultaneously with <br />tf~velopment of River's Bend 3rd. tt is projected as an assessment project with the portion not <br />a~;sessable picked up by MSA funds. This portion would be that above the residential or the <br />commercial equivalent. <br /> <br />Project Year <br /> <br />Xldmo Street N.W. from 142nd 1993 <br />Avenue N.W. to Trunk Highway <br />g47 <br /> <br />$ 68,000 - Assessment - <br />$ 17,000 - MSA <br /> <br />$ 85,000 <br /> <br />Project g7 . Wac0 Street / Waco Drive Paving <br /> <br />This project consists of the regracIing and paving of 1,700 feet of dirt street located on Waeo Drive <br />N.W. and Waco Street N.W., north of 179th Lane N.W.. The existing streets are proposed to be <br />gratied and paved with a 28 foot wide suburban street section with bituminous curb. The project <br />has been petitioned for by the benefited property owners. The estimated construction cost is <br />$30,200 and overhead and previous paving costs will bring the tod project cost to $43,200. This <br />project is anticipatexi to be completed during the summer of 1993. <br /> <br />Proiect X_e. az <br /> <br />Waco Drive / Street north of 179th 1993 <br /> <br />433,00 - Assessment <br /> <br />43,200 <br /> <br />Project g8 . 149th Lane N.W. <br /> <br />This project includes the extension of sanitary sewer, watermain and street restoration to 12 pm'eels <br />fronting on 149th Lane N.W. west of the new Ramsey Meat:lows Addition. This improvement <br />was petitioned for by the benefited property owners. The estimated project construction cost is <br />$58,500 and the total project cost, including 3% overhea& is estimat~ to be $76,100. <br /> <br />Project X..eaZ ~ <br />149th Lane N.W. 1993 $ 76,100- Assessment <br /> <br />$76,100 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.