My WebLink
|
Help
|
About
|
Sign Out
Home
02/02/93
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1990's
>
1993
>
02/02/93
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 9:22:39 AM
Creation date
4/2/2004 10:29:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
02/02/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17. <br /> <br />18. <br /> <br />19. <br /> <br />20. <br /> <br />21. <br /> <br />22. <br /> <br />23. <br /> <br />24. <br /> <br />25. <br /> <br />northern boundary until the buffer area has been established such that the trees planted in <br />the buffer area are at least six (6) feet in height. <br /> <br />All costs incurred by the City in executing and administering this permit shall be the <br />responsibility of the permit holder. The permit holder shall maintain a $2,000 balance in an <br />escrow account with the City. This escrow shall be used to reimburse the City for <br />expenses incurred in the administration of this permit. At the time the extraction operation <br />and site restoration are completed to the satisfaction of the City, the balance of the escrow <br />shall be returned to Barton Sand and Gravel, Incorporated. <br /> <br />Access to the subject property shall be from County Road 116 only. <br /> <br />Only State, County and Municipal State Aid streets constructed to 9 ton standard shall be <br />used as haul roads. <br /> <br />Excavation and removal of material from the site shall be limited to an elevation of 875 <br />above sea level. <br /> <br />All disturbed areas in the site shall be restored with topsoil and shall be seeded. Barton <br />Sand and Gravel, Inc., shall not remove the existing topsoil from the site and the existing <br />topsoil shall be used in the restoration of the site. Any placement of imported topsoil shall <br />be limited to the top one (1) foot. All imported topsoil shall be the requirements of Ph and <br />organic matter in Section 3877 of the current Mn/DOT Standard Specifications for <br />construction. <br /> <br />All mining operations shall be conducted between 6:30 a.m. and 8 p.m. on weekdays only <br />unless otherwise specifically approved by the City Administrator and/or his designee. <br /> <br />The amount of dust or other particulate matter caused by the mining operation shall not <br />exceed the standards established by the Minnesota Pollution Control Agency. No operation <br />shall be allowed when wind gust exceed 30 miles per' hour. <br /> <br />All operations shall comply with all applicable Minnesota Pollution Control Agency <br />regulations and Federal and Environmental Protection Agency regulations for the protection <br />of water quality. <br /> <br />All haul roads are subject to the approval of the City Engineer. While hauling operations <br />are in progress, the permit holder shall maintain the haul road in a condition satisfactory to <br />the City Engineer. When hauling operations are completed, the permit holder shall either <br />restore that haul road to a condition at least equal to that which existed at the time the <br />hauling operations were started, or compensate the local road authority in an amount <br />satisfactory to that road authority and concurred in by the City Engineer for the restoration <br />of that haul road. The City Engineer will then accept such restoration or concur in such <br />financial settlement for the restoration of the haul road in writing and such acceptance will <br />relieve the permit holder of any additional obligation in connection with the restoration of <br />the haul roads. If the permit holder fails or refuses to perform haul road restoration or to <br />make satisfactory financial settlement for such' restoration, the City will cause the <br />restoration work to be done and require reimbursement from the financial guarantee <br />required herein. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.