My WebLink
|
Help
|
About
|
Sign Out
Home
02/02/93
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1990's
>
1993
>
02/02/93
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 9:22:39 AM
Creation date
4/2/2004 10:29:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
02/02/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~onitoring shall include the following State and Federal <br />criteria pollutant emissions as may e:~ist from time to time <br />during the term of this permit. The cost of such testing and <br />reports shall be borne by the Permit Holder. <br /> <br />OUTLINE OF REVISED MONITORING PROGRAM <br /> <br />Sample Type <br /> <br />Parameter <br /> <br />Frequency* <br /> <br />Stack Emissions Particulates, opacity, <br /> <br />Annually (3 samples <br />minimum per event) <br /> <br />*Assumes no significant change in wastes to be incinerated. <br /> <br />The City and the Peak-mit Holder may mutually agree to revise <br />the monitoring program from time to time. Such revisions <br />shall be authorized in accordance with Condition 36 herein. <br /> <br />Installation of Afterburners. The Permit Holder shall install <br />and operate afterburners for each melt furnace to minimize <br />stack emissions. An afterburner unit shall be installed on <br />each melt furnace no later than March 15, 1991. <br /> <br />Emerqenc¥ Emissions Testing. If, in the opinion of the City <br />Administrator or his authorized representative, it is <br />determined to conduct pollution tests during an officially <br />reported incident, the City may contract with an independent <br />testing laboratory who shall be permitted access to the <br />facility to conduct tests as may be prescribed by the City and <br />to evalute conditions of the facility° The cost of such <br />evaluation testing and reports shall be borne by the Permit <br />Holder and payment for such costs will be due within 30 days <br />of the invoice date. <br /> <br />Corrective Actions. The City may order the Permit Holder to <br />undertake corrective actions within specific timeframes based <br />on test results or evalutions to remedy pollution problems or <br />nuisance complaints. If the Permit Holder fails to take <br />corrective action within specified time frames, it may be <br />determined by the City Council to be a violation of the CUP <br />and cause for permit revocation. <br /> <br />10o <br /> <br />Dissassemb!v of Enqines, Transmissions, Other Feedstock. <br />Dissassembly of engines, tranmissions shall not be permitted <br />on the Site under this Conditional Use Permit. Disassembly <br />of the feedstock is permitted only within an opaquely screened <br />area or within the building. <br /> <br />2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.