My WebLink
|
Help
|
About
|
Sign Out
Home
02/02/93
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1990's
>
1993
>
02/02/93
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 9:22:39 AM
Creation date
4/2/2004 10:29:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
02/02/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
during the period of this CUP. An independent testing laboratory shall conduct emissions <br />monitoring at least once per year or on a more frequent basis if pollutants are in excess of <br />standards. The Permit Holder shall make a complete report available to the City within <br />thirty (30) days of completion by the testing laboratory. At a minimum, the parameters of <br />such emissions monitoring shall include the following State and Federal criteria pollutant <br />emissions as may exist from time to time during the term of this permit. The cost of such <br />testing and reports shall be borne by the Permit Holder. <br /> <br />OUTLINE OF MONITORING PROGRAM <br /> <br />10. <br /> <br />11. <br /> <br />12 <br /> <br />13. <br /> <br />Sample Type <br />Stack Emissions <br /> <br /> Parameter <br />Particulates, opacity <br /> <br /> Frequency* <br />Annually <br />(3 samples minimum per event) <br /> <br />*Assumes no significant change in wastes to be incinerated. <br /> <br />The City and the Permit Holder may mutually agree to revise the monitoring program from <br />time to time. Such revisions shall be authorized in accordance with Condition #40 herein. <br /> <br />Installation of Afterburners. The Permit Holder shall install and operate afterburners <br />for each melt furnace to minimize stack emissions. An afterburner unit shall be installed on <br />each melt furnace no later than 120 days from the date of PCA approval of the test <br />afterburner. <br /> <br />Emergency Emissions Testing. If, in the opinion of the City Administrator or his <br />authorized representative, it is determined to conduct pollution tests during an officially <br />reported incident, the City may contract with an independent testing laboratory who shall be <br />permitted access to the facility to conduct tests as may be prescribed by the City and to <br />evaluate conditions of the facility. The cost of such evaluation testing and reports shall be <br />borne by the Permit Holder and payment for such costs will be due within 30 days of the <br />invoice date. <br /> <br />Corrective Actions. The City may order the Permit Holder to undertake corrective <br />actions within specific time frames based on test results or evaluations to remedy pollution <br />problems or nuisance complaints. If the Permit Holder fails to take corrective action within <br />specified time frames, it may be determined by the City Council to be a violation of the <br />CUP and cause for permit revocation. <br /> <br />Disassembly of Engines and Transmissions, and Preparation of Feedstock. <br />Disassembly of engines and transmissions shall not be permitted on the Site under this <br />Conditional Use Permit unless conducted wholly within a building and in accordance with <br />County, State and Federal requirements. Preparation of all other feedstock is permitted <br />only within an opaguely screened area or within the building. <br /> <br />Storage of Engines and Transmissions. Any exterior storage of transmissions and <br />engines shall be in leak-proof containers. <br /> <br />Storage of Batteries. Batteries shall be stored in acid resistant, leak proof containers in <br />accordance with Anoka County and MPCA regulations. <br /> <br />Waste Oil, All waste oil shall be collected for recycling in accordance with Anoka <br />County and MPCA regulations. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.