Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br />The drainage system consists of channelling street runoff to two dry, four foot <br />depressions. These depressions are connected with storm sewer and propose to overflow <br />through the adjacent Cedar Hills subdivision. Since these are drainage areas will be <br />normally dry, the aesthetics at influent points becomes a concern. Sediment and litter fi-om <br />the streets can accumulate at inflow points. As a result, Staff believes the number of such <br />points should be kept to a minimum. Staff recommends that the discharge from Vanadium <br />Street N.W. be eliminated and routed to the discharge point from 142nd Avenue N.W. <br />Also, Staff has not received engineering calculations regarding the sizing of the ponding <br />area, and therefore approval of this plan is contingent upon verification of these pond sizes <br />and the allowable overflow discharge rate. The drainage and grading plan does not include <br />commercial and multi-family residential Lots 33 and 34. <br /> <br />The Planning and Zoning Commission will be meeting at 7:30 p,m. on Tuesday, October 5, i993 <br />to consider the request for preliminary plat approval of Sunfish Square. We suggest that you, or <br />your representative, be present at the meeting to answer any questions that may arise. <br /> <br />If you have any questions, please feel free to call at 427-1410. <br /> <br />Respectfully, <br /> <br />Sylvia Frolik Steven Jankowstd <br />Zorfi~g Administrator City Engbeer <br /> <br />I <br />I <br /> <br />Jeff Caine <br />Caine & Associates <br />17720 Hwy. #65 N.E. <br />Ham Lake, MN 55304 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br /> <br />