Laserfiche WebLink
East Park <br /> <br />Ramsey Town Center Parks Proposal Analysis <br /> for <br /> Ramsey Park Recreation Commission <br /> <br />City Priorities <br /> <br />Sitework Eslimate LLC Proposal Essentials <br />Total 1,774,628.75 1,162,128.75 954,128.75 <br />Erosion Control 8,558.00 8,558.00 <br /> perimeter silt fence 8,558.00 e 8,558.00 <br />Civil Utilities 25,000.00 <br /> misc utilities connections 25,000.00 c <br />Eadhwork & Draintile 212,110.75 212,110.75 <br /> finish grading 25,000.00 e 25,000.00 <br /> impod fill 50,000.00 e 50,000.00 <br /> EPDM Pond Liner 137,110.75 e 137,110.75 <br />Bituminous 42,156.00 42,156.00 <br /> 8' walking paths 14,436.00 e 14,436.00 <br /> 10' mixed use trail 25,200.00 e 25,200.00 <br /> Striping for trail 2,520.00 e 2,520.00 <br />Concrete 237,624.00 23?,624.00 <br /> Promenade 21,000.00 e 21,000.00 <br /> Plazas 63,030.00 e 63,030.Q0 <br /> t~ulkhead wall 109,944.00 e 109,944.00 <br /> curb stormwater spreader edges 36,150.00 e 36,150.00 <br /> conc pads 8 - benches 3,000.00 a <br /> conc pads 8 - tables 4,500.00 a <br />Architecture + Amenities 637,420.00 67,420.00 <br /> amphitheater 300,000.00 c <br /> bddge 21,600.00 e 21,600.00 <br /> open air wetland pavillion 50,000.00 c <br /> park pavillion w/bathrooms 200,000.00 c <br /> boardwalk 45,820.00 e 45,820.00 <br /> entry monument 20,000.00 c <br />Lighting + Site Electrical 121,000.00 103,500.00 <br /> building service 2,500.00 c <br /> site electrical service 15,000.00 c <br /> pole lights at promenade 31,500.00 a <br /> pole lights at water[font 45,000.00 a <br /> pole lights at benches 27,000.00 a <br />Site Furnishings 97,000.00 97,000.00 <br /> benches park 40,000.00 a <br /> benches promenade 28,000.00 a <br /> trash receptacles 12,000.00 a <br /> picnic tables 9,500.00 a <br /> ddnking fountain 5,000.00 a <br /> grilles 1,500.00 a <br /> bike parking loops 1,000.00 a <br />Railings, Fencing and Metal Work 78,350.00 78,350.00 <br /> guardrail/hand rail 76,350.00 e 76,350.00 <br /> metal ramps for boardwalk access 2,000.00 e 2,000.00 <br />Miscellaneous Landscape Improvements 315,410.00 315,410.00 <br /> native seeding 7,000.00 e 7,000,00 <br /> turf seeding 16,530.00 e 16,530.00 <br /> trees 2 1/2" 60,000.00 e 60,000.00 <br /> trees 6' clump 40,000.00 e 40,000.00 <br /> shrubs #5 22,500.00 e 22,500.00 <br /> wetland infiltration basin construction 169,380.00 e 169,380.00 <br /> <br />Amenities <br /> <br />208,000.00 <br /> <br />3,000.00 <br />4,500.00 <br /> <br />31,500.00 <br />45,000.00 <br />27,000.00 <br /> <br />40,000.00 <br />28,000.00 <br />12,000.00 <br />9,5OO.OO <br />5,000.00 <br />1,5O0.00 <br />1,000.00 <br /> <br />Future City <br />Improvements <br /> 612,500.00 <br /> <br />25,000.00 <br /> <br />300,000.00 <br /> <br />50,000.00 <br />200,000.00 <br /> <br /> 20,000.00 <br /> <br /> 2,500.00 <br /> 15,000.00 <br /> <br /> printed 4/2/2004 <br /> <br />6 <br /> <br /> <br />