Laserfiche WebLink
South Park <br /> <br />Ramsey Town Center Parks Proposal Analysis <br /> for <br /> Ramsey Park Recreation Commission <br /> <br />City Priorities <br /> <br />Sitework Estimale LLC Proposal Essentials <br />Total 1,725,734.00 1,463,234.00 1,369,434.00 <br />Erosion Control 4,160,00 4,160.00 <br /> perimeter silt fence 4,160.00 e 4,160.00 <br />Civil Utilities 35,000,00 <br /> misc utilities connections 35,000.00 c <br />Eadhwork & Drainfile 457,360.00 457,360.00 <br /> finish grading 49,760.00 e 49,760.00 <br /> Netlon Parking Secondary + overflow 407,600.00 e 407,600.00 <br />Biluminous 37,18B.00 37,188.00 <br /> Parking Lot 37,188.00 e 37,188.00 <br />Concrete 92,670.00 92,670.00 <br /> Walks 75,185.00 e 75,185.00 <br /> Conc pads shelter 3,840.00 e 3,840.00 <br /> conc pads bench 1,000.00 a <br /> conc pads table 2,700.00 a <br /> curb & gutter plaza edge 9,945.00 e 9,945.00 <br />Amenities 904,440.00 679,440.00 <br /> park structure w/bathrooms 200,000.00 c <br /> Pedestrian bridge 19,440.00 e 19,440.00 <br /> baseball field 300,000.00 e 300,000.00 <br /> soccer field 300,000.00 e 300,000.00 <br /> small tot Iol 60,000.00 e 60,000.00 <br /> arbors 25,000.00 c <br />Lighting + Site Electrical 71,500.00 69,000.00 <br /> building service 2,500.00 c <br /> site electrical service 15,000.00 a <br /> pole lights 54,000.00 a <br />Site Furnishings 21,100.00 21,100.00 <br /> benches park 8,000.00 a <br /> . benches promenade 5,700.00 a <br /> grilles 900.00 a <br /> drinking fountain 3,500.00 a <br /> trash receptacles 3,000.00 a <br />Miscellaneous Landscape Improvements 102,316.00 102,316.00 <br /> native seeding 7,000.00 e 7,000.00 <br /> sod 15,516.00 e 15,516.00 <br /> Irees 2 1/2" 18,000.00 e 18,000.00 <br /> trees 6' clump 30,000.00 e 30,000.00 <br /> trees coniferous 5' 22,800.00 e 22,800.00 <br /> shrubs #5 4,500.00 e 4,500.00 <br /> wetland infiltration basin construction 4,500.00 e 4,500.00 <br /> <br />Amenities <br /> <br />93,800.00 <br /> <br />1,00o.0o <br />2,700.00 <br /> <br />15,o00.0o <br />54,000.00 <br /> <br />8,000.00 <br />5,700.00 <br /> g00.oo <br />3,500.o0 <br />3,000.00 <br /> <br />Future City <br />Improvements <br /> <br /> 262,500.00 <br /> <br />35,000.00 <br /> <br />200,000.00 <br /> <br />25,000.00 <br />2,500.00 <br /> <br />prinled 4/2/2004 <br /> <br /> <br />