Laserfiche WebLink
Schedule B Sanitary_, Sewer <br /> <br />12" DIP CL 50 <br />6" DIP CL 52 <br />1" Copper service pipe <br />12" Gate valve with box <br />6" Gate valve (salvage & reset) <br />6" Gate valve <br />1" Corporation stop <br />1" Curb stop with box <br />Standard hydrant <br />DI figs. <br /> Total Schedule B: <br /> <br />Estimated <br /> ~ Unit Price <br /> <br />255 I:t. 16.00~t. 4,080.00 <br />470 Et. 10.00/Ft. 4,700.00 <br />595 l:;t. 7.00/Pt. 4,165.00 <br />1 Ea. 737.00/Ea. 737.00 <br />1 Ea. *302.00/Ea. 302.00 <br />1 Ea. 302.00/Ea. 302.00 <br />15 Ea. 16.00/Ea. 240.00 <br />15 Ea. 61.00/Ea. 915.00 <br />1 Ea. 990.00/Ea. 990.00 <br />665 Lb. 0.81/Lb. 538.65 <br /> 16,969.65 <br /> <br />Schedule C Street Improvements <br /> <br />/tern/Description <br /> <br />Subgrade preparation <br />Class V aggregate base <br />Bituminous wear course, Type 41 <br />Surmountable concrete curb & gutter <br />Turf establishment <br /> Total Schedule C: <br /> <br />Estimated <br /> OuantiB, Unit Price Extension <br /> <br />7 RS 76.50 535.50 <br />550 Tn. 5.8 lfrn. 3,195.50 <br />320 Tn. 22.19frn. 7,100.80 <br />1,480 Ft. 4.39/1::t. 6,497.20 <br />0.6 Ac. 970/Ac. 582.00 <br /> 17,911.00 <br /> <br />Schedule D Storm Sewer <br />Item/Description <br /> <br />Estimated <br />Ouantit?, Unit Price Extension <br /> <br />Standard 48" storm manhole <br />Standard catch basin <br />15" PE storm pipe <br />15" CMP Apron with guard <br />Rip rap with geotextile <br /> Total Schedule D: <br /> <br />2 Ea. 830.00/Ea. 1,660.00 <br />1 Ea. 600.00/Ea. 600.00 <br />580 Ft. *13.85/Ft. 8,033.00 <br />1 Ea. *430.00,rEa. 430.00 <br />4 Cu. Yd. 50.00/Cu. Yd. 200.00 <br /> 10,923.00 <br /> <br />*It:ms for which unit prices have been negotiated as no unit prices were submitted for the original <br />Improvement Project ~32-17. <br /> <br />Total in Change Order Price (Schedule A, B, C & D): <br /> <br />$60,998.45 <br /> <br />Revised Contract Amount Including this Change Order:. <br /> <br />$478,294.53 <br /> <br /> <br />