CHANGE ORDER NO. 1 <br />CITY IMPROVEMENT PROJECT #92-19 <br /> <br />Improvement Project: <br /> <br />Contractor: <br />Current Contract Amount: <br />Award Date: <br />Completion Date: <br /> <br />~92-19; Sanitary Sewer, Watermain, Storm Sewer <br />and Street Construction <br />Bonine Excavating, Inc., Elk River, MN 55330 <br />$417,296.08 <br />August 26, I992 <br />June 1, 1993 <br /> <br />Description and Justification of Change: <br /> <br />Subsequent to the award of Improvement Project #92-17 to the Contractor, residents of property <br />adjacent to the project petitioned for improvement of a similar nature to be extended to their <br />properties. Improvement Project ~g92-19 was established in response to this petition and has <br />progressed to the point where, on January 26, 1993, City Council authorized the project to <br />proceed. The original project was competitively bid and State Statute 429.041(7) allows for <br />increasing the scope of such a public project by Change Order up to an amount of 25 pement of the <br />original contract at the same unit prices. The scope of project change falls within this allowable <br />range. The Contractor and Owner are agreeable to extending the scope of the project at the bid unit <br />prices. The work shall be performed in accordance with a two sheet set of plans last revised March <br />16, I993, prepared by Steven J. Jankowsk. i and the specifications for Project #92-17. Although <br />there are several unit prices for which there were no established unit prices, the amount of such <br />work represents tess than 5% of the proposed change order amount. <br /> <br />Change in Cost: <br /> <br />The Contractor and Owner agree to the following unit prices a~ the basis for the expanded scope of <br />work Estimated quantifies below provide the projected increase in the contract amount. <br /> <br />Schedule A Sanitary. Sewer <br />Item/Description <br /> <br />Estimated <br /> Ouanriw Unit Price Extension <br /> <br />8" PVC SDR 35 0-10' dp 50 Ft. <br />8"PVC SDR 35 10-12' dp 220 <br />8" PVC SDR 35 12-14' dp 255 <br />8" PVC SDR 35 14-t6' dp 250 <br />48" diameter rnnnhole with casting 0-8' dp 2 Ea. <br />Excess manhole > 8' t0.1 Et. <br />Service connection riser 10 Ea. <br />4" PVC service pipe 615 Ft. <br />8" x 4" PVC service wye 14 Ea. <br /> Total Schedule A: <br /> <br />8.00~t. 400.00 <br />9.00/i% 1,980.00 <br />10.00/Ft. 2,550.00 <br />1.00/izt. 2,750.00 <br />965.00/Ea. 1,930.00 <br />68.00/Ft. 686.80 <br />90.00/Ea. 900.00 <br />6.00/Ft. .3,690.00 <br />22.00/Ea. 308.00 <br /> 15,194.80 <br /> <br />la- <br /> <br /> <br />