My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/27/1993
Ramsey
>
Public
>
Agendas
>
Council
>
1993
>
Agenda - Council - 04/27/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 3:50:38 PM
Creation date
4/9/2004 11:20:40 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/27/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Variance Io Stree! Length. The City hereby grants a variance to the maximum dead- <br />end street length and approves the approximate 850 foot extension of Argon Street N.W., <br />south of ]4?th Avenue N.W. <br /> <br />,Additional Drainage t'Z~lsemenls. Approval of tile subdivision drainage plan, <br />including wetland mitigation has been sought from tile Lower Rum River Water <br />Management Organization (LRRWMO). It is anticipated that necessary approval will be <br />obtained within tile provisions of the final plat document subn'fined. However, in tile event <br />that additional easements may be needed to facilitate drainage provisions required by the <br />LRRWMO, the DEVELOPER will convey such easements by separate, recordable <br />documem to the CITY lit tile DEVELOPER'S expense. <br /> <br />Boulevard and Area Reslora/ion. The DEVELOPERS shall be responsible for the <br />cost of establishing se~d or sod in all boulevards within thirty (30) days of the completion <br />of the street improvements, and restoring all other areas disturbed by the development <br />~ading operation in accordance with the approved erosion and sediment control plan. The <br />DEVELOPERS shall also be responsible for the cost of cleaning any soil, earth or debris <br />from the wetlands within and adjacent to this Plat resulting from grading performed in the <br />development of the land. <br /> <br />Requirements Afler S/reel Surfg~eing. After the street surfacing is installed, the <br />DEVELOPERS shall clear any soil, earth, or debris from the streets and from the lots <br />within the Plat resulting from any construction on the Subject Property by the <br />DEVELOPERS or their successors and assigns. <br /> <br />10. <br /> <br />Stage I Improvements Completion Date. The Improvement completion date shall <br />be on or before December 3 l, 1993. <br /> <br />11. <br /> <br />Sta~2e I Imnrovement Financial Guarantee. The DEVELOPERS agree and <br />understands that the CITY has the right, privilege and authority pursuant to Minnesota <br />Statutes Chapter 462.358 and as amended as a condition precedent to the approval of the <br />plans and specifications and approval of a final plat, to prescribe requirements and the <br />extent to which, and the manner in which the streets are to be graded or improved, and the <br />installation of sewer and water and other facilities and that the DEVELOPERS shall <br />provide a financial guarantee to the CITY to provide for the actual construction and <br />installation of the required Stage i Improvements within a period specified by the City <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.