Laserfiche WebLink
TABLE 1 <br />ESTIMATED PROJECT <br /> <br />COSTS <br /> <br />Bituminous paving <br /> <br />Bituminous curbing <br /> <br />Restoration behind curb <br /> <br />Estimated construction cost <br /> <br />Overhead costs <br /> <br />Total Project Cost <br /> <br />512 ton @ $25 / ton <br />600 feet @ $0.50 / foot <br /> Lump sum <br /> <br />@30% Construction Cost <br /> <br />$12,800 <br />300 <br />500 <br />13,600 <br />4,080 <br />17,680 <br /> <br />FINP~NCING AND ASSESSMENT <br /> <br />Exhibit A identifies eight propeties which were determined to recieve direct benefit from this <br />project. All benefited parcels are developed with single family residences. It is propocd that all <br />directly benefited lots be equally assessed regardless of individual front footages or value of <br />improvements on individual lots, as this has been past City policy on previous paving projects. <br /> <br />If the project should proceed to the stage where the City Council authorizes plans to be prepared <br />and bids to be solicited as required by law, the City Council may award the construction to the <br />lowest responsible bidder, providing that bid does not exceed 110% of the construction cost <br />estimates contained herein. After the project has been completed and final costs are known, the <br />public hearing will be held which will identify actual costs to be recovered by special assessment. <br />Each benefitted property may, at any time prior to certification of the assessment to the County <br />Auditor, pay the whole of the assessment on such property, with interest accrued to the date of <br />payment, to the City Treasurer, except that no interest shall be charged if the entire assessment is <br />paid within 30 days from the adoption of the assessment resolution. Special assessments reported <br />to Anoka County shall be payable over a ten year period with interest at a rate of 2% above prime <br />rate at the time of the special assessment hearing. This rate is estimated to be 8%. The costs <br />pesented in this report are estimates. Table 2 presents a project financing summary as it wouild <br />affect individual properties. <br /> <br /> <br />