My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/27/1993
Ramsey
>
Public
>
Agendas
>
Council
>
1993
>
Agenda - Council - 07/27/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 3:53:03 PM
Creation date
4/12/2004 11:59:18 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/27/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESTIMATED PRO.IECT COSTS <br /> <br />A detailed estimate of construction costs are presented in Table 1. In addition to the construction <br />costs, overhead costs include engineering, construction staking and inspection, legal, <br />administration, interest during construction, and contingencies. The overhead costs for the project <br />are estimated based upon percentages of construction cost. Those percentages are estimated to be <br />as follows: <br /> <br />Engineering <br />Staking and Inspection <br />Bonding and Legal <br />City Staff Administration <br />Contingencies <br /> <br />10% <br /> 7% <br /> 3% <br /> 5% <br /> 5% <br /> <br /> TABLE 1 <br /> PROJECT ~93-13 <br />ESTIMATED PROJECT COST <br /> <br />Improvemen[ <br /> <br />Bituminous Paving <br />Class V Base <br />Shaping and Grading <br />Tuff Restoration <br />Construction Cost Total <br />Overhead @ 30% <br />Total Project Cost <br /> <br />Ouanti~ Cost <br /> <br />364 tons $25 ton <br />740 tons $6 ton <br />Lump Sum $3,000 <br />1.12 ac. $l,500/acre <br /> <br /> Total <br />Project Cost <br /> $9,100 <br /> $4,440 <br /> $3,000 <br /> $1693 <br /> $18,233 <br /> $5.470 <br /> $23,703 <br /> <br />Exhibit A identifies fourteen properties which were determined to receive direct benefit from this <br />project. Ail benefited parcats, except parcels 8 and 11, are developed with single family <br />residences. Parcels 8 and 11 are considered to be buildable. It is proposed that all directly <br />benefitted lots be equally assessed regardless of individual front footages or value of improvements <br />on individual lots, as this has been past City policy on previous paving projects. <br /> <br />If the project should proceed to the stage where the City Council authorizes plans to be prepared <br />and bids to be solicited as required by law, the City Council may award the construction to the <br />lowest responsible bidder, providing that bid does not exceed 110% of the construction costs <br />estimates contained herein. After the project has been completed and final costs are known, the <br />public hearing will be held which will identify the actual costs to be recovered by special <br />assessment. Each property may, at any rime prior to certification of the assessment to the County <br />Auditor, pay the whole of the assessment of such property, with interest, except that no interest <br />shall be charged if the entire assessment is paid within (30) days from the adoption of the <br />resolution. Special assessments reported to Anoka County~ shall be payable over a ten (10) year <br />period with interest at a rate of 2% above prime rate at the rime of the special assessment hearing. <br />This rate is estimated to be 8%. The costs presented in this report are estimates. Table 2 presents a <br />project financing summary as it would affect individual properties. <br /> <br />2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.