Laserfiche WebLink
Mr. Ryan Sc,broeder <br />Aught 24, 1993 <br />Page 2 <br /> <br />TASK 2 <br /> <br />PRELIMINARY ENGINEERING <br /> <br />RLK Associates will provide preliminaD' design of the 153rd Avenue N.W. roadway to <br />define centertine ~rade and construction limits. Design calculations, horizontal and <br />vertical curves and cl~ar zone limitations shall reflect recent updates to MSAS standards. <br /> .. <br /> <br />We will provide the City with base sheets showing preliminary design cross sections on 200' <br />spacing and likely construction limits. <br /> <br />TASK 3 <br /> <br />RIGHT-©F-WAY MAP <br /> <br />After the City Engineer's review of preliminaD' design as submitted by RLK Associates, <br />we shall prepare a right-of-way map to Scare Aid standar~ showing routing alignment, <br />right-of-way, and prope.~y acquisitions required to extend 153rd Avenue N.W. Legal <br />descriptions of right-of-way acquisitions will be provided. <br /> <br />The level of effort and cost of engineer/nd se?wices are esthnaated as follows: <br /> <br />TASK 1 <br /> <br />SURVEY & MAPPING <br /> <br />2 Man Crew <br />Registexed Land Survey <br />Design Technical <br />Direct Expense <br /> <br />20 'hrs. <br /> 4 hrs. <br />16 hrs. <br />600.00 <br /> <br />F~timated Cost <br /> <br />$2,200.00 <br /> <br />T~K2 <br /> <br />PRELIMINARY DFC. SI GN <br /> <br />Project Engineer <br />Design Technician <br />Secretarial <br />Direct Expense <br /> <br />Estimated Cost <br /> <br /> t6 hrs. <br /> 4hrs. <br /> 4oo.0o <br /> <br />'$2,000.00 <br /> <br /> <br />