My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/14/1993
Ramsey
>
Public
>
Agendas
>
Council
>
1993
>
Agenda - Council - 09/14/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 3:54:17 PM
Creation date
4/12/2004 12:27:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/14/1993
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Ryan Sc,broeder <br />Aught 24, 1993 <br />Page 2 <br /> <br />TASK 2 <br /> <br />PRELIMINARY ENGINEERING <br /> <br />RLK Associates will provide preliminaD' design of the 153rd Avenue N.W. roadway to <br />define centertine ~rade and construction limits. Design calculations, horizontal and <br />vertical curves and cl~ar zone limitations shall reflect recent updates to MSAS standards. <br /> .. <br /> <br />We will provide the City with base sheets showing preliminary design cross sections on 200' <br />spacing and likely construction limits. <br /> <br />TASK 3 <br /> <br />RIGHT-©F-WAY MAP <br /> <br />After the City Engineer's review of preliminaD' design as submitted by RLK Associates, <br />we shall prepare a right-of-way map to Scare Aid standar~ showing routing alignment, <br />right-of-way, and prope.~y acquisitions required to extend 153rd Avenue N.W. Legal <br />descriptions of right-of-way acquisitions will be provided. <br /> <br />The level of effort and cost of engineer/nd se?wices are esthnaated as follows: <br /> <br />TASK 1 <br /> <br />SURVEY & MAPPING <br /> <br />2 Man Crew <br />Registexed Land Survey <br />Design Technical <br />Direct Expense <br /> <br />20 'hrs. <br /> 4 hrs. <br />16 hrs. <br />600.00 <br /> <br />F~timated Cost <br /> <br />$2,200.00 <br /> <br />T~K2 <br /> <br />PRELIMINARY DFC. SI GN <br /> <br />Project Engineer <br />Design Technician <br />Secretarial <br />Direct Expense <br /> <br />Estimated Cost <br /> <br /> t6 hrs. <br /> 4hrs. <br /> 4oo.0o <br /> <br />'$2,000.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.