Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br />13. <br /> <br />and operation costs; billings will be initiated at the time of connection to municipal water <br /> <br />and sanitary sewer. The cost of these items is: <br /> Street Cleaning <br /> Sealcoating <br /> <br /> Three (3) Street Sign(s) <br /> Five (5)) Street Light(s) <br /> Street Light Maintenance & Operation (3 Years) <br /> <br />$300.00 <br />$4,400.00 <br />$360.00 <br />$2,200.00 <br />$1,350.00 <br /> <br /> TOTAL $8,610.00 <br /> <br />Hard Surfaced Driveways and Sodded Boulevards. Hard surfaced driveways <br />and sodded boulevards are a requirement for each lot in the Plat. Said improvements shall <br />be installed by the building permit applicant or the homeowner at the time the Certificate of <br />Occupancy is issued or as soon thereafter as possible, weather permitting. In the event <br />these improvements are not timely installed, the DEVELOPER, on behalf of all <br />subsequent owners of lots within the Plat, agrees that the CITY may install said <br />improvements on any lot(s) and specially assess its cost therefore against the lot(s). The <br />DEVELOPER hereby waives all right to a public hearing and other statutory rights or <br />City Charter rights granted a property owner relating to special assessments, including the <br />right to appeal the special assessment for installation of the improvements described in this <br />paragraph. In addition, the DEVELOPER grants the' right to the CITY to enter on each <br />lot of the Plat in order to install the improvements described in this paragraph, in the event <br />it is necessary for the CITY to install these improvements and specially assess the same. <br /> <br />III. <br /> <br />I <br />I <br />I <br />i <br /> <br />14. <br /> <br />PERMITS, OCCUPANCY AND PROPERTY VALUES: <br /> <br />Requirements for Building Permits. No occupancy permit for any lot in the Plat <br />shall be issued until (a) vehicular access to the lot is provided including the installation of <br />Class V material on all streets in the Plat; (b) site plan approval is granted by the CITY and <br />any additional expense incurred in giving site plan approval has been reimbursed to the <br />CITY; (c) a Certificate of Survey, including that information required by the CITY, has <br />been supplied to the City Building Official; and (d) all the fmanciat guarantees required by <br />the CITY have been satisfied. <br /> <br />15. Requirement8 fur Plumbing, As a part of the plumbing requirements, backflow <br /> <br />I <br />! <br /> <br /> <br />