My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/12/1993
Ramsey
>
Public
>
Agendas
>
Council
>
1993
>
Agenda - Council - 10/12/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 3:54:53 PM
Creation date
4/12/2004 2:55:02 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/12/1993
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Off Street Parking Spaces: According to City Code, the following off-street parking <br />spaces are required for this site: liquor store - I 1 (1 space per 200 square feet of retail <br />display space); auto repair shop - 13 (1 space for each of the 4 employees and 3 spaces for <br />each bay or in this case, overhead doors, 2 existing and 1 proposed); auto body shop - 21 <br />(1 space for each of the 3 employees and 3 spaces for each of the 6 overhead doors, 2 <br />existing and 4 proposed); duplex - 4 (2 per dwelling unit); used car lot - 2 (1 per 10 cars <br />displayed, assuming car lot continues to remain a small operation). As the site is ultimately <br />proposed to be developed, 51 parking spaces are requirecL However, the proposed use of <br />the northerly most suite to be added is not indicated on the site plan and the number of off- <br />sn;eet parking spaces required for this site would increase accordingly. Only i9 off-street <br />parking spaces have been scaled off on the site plan. Additional parking spaces could be <br />scaled off in the northeast comer of the site in the fenced area as this space is intended to <br />provide secure off-street parking for cars awaiting body repairs. It should also be noted <br />that this fenced area may not be used to store equipment, supplies, vehicle parts, or <br />vehicles being dismantled for parts. <br /> <br />Si~e Access: The site is currently served by two accesses onto Highway #10 which are <br />located approximately 180 feet apart. It has been a recognized goal to reduce the number of <br />accesses onto Highway #10 as much as practical. It is Staffs recommendation that the site <br />be allowed a single access. <br /> <br />Desi~ of Driveway. Off-Street Parking Area and Loading Facili~¢~; City Code requires <br />that off-street parkinf-a~eas, driveways andn"~ading areas be surfaced with concrete or <br />asphalt and finished with concrete curbing. The pavement existing on the site is in <br />disrepair and the developer has indicated that an overlay of the pavement, which will <br />include the installation of cement curbing along the front of the site, will have been <br />accomplished by the rime the Planning Commission reviews the site plan. According to <br />City Code, the pavement will also have to be extended to serve the two northerly suites to <br />be added, the secure parking area in the northeast comer will have to be paved, and <br />pavement will have to be installed along the west property line to provide access to the 3 <br />overhead doors proposed on that side of the service 9enter. The outer perimeters of these <br />paved areas will have to be finished with concrete curbing. The site plan should be <br />modified to clearly indicate the areas to paved and curbed. The developer is seeking a 2 <br />year rime frame, versus the standard 1 year, to accomplish these site improvements. <br /> <br />Utilities: The site is presently served by on-site sardtary sewer and.municipal water. There <br />is no information in the property fling indicating the location of these services. The <br />Building Official has requested that the site plan be modified to show the locations of the on- <br />site wells and septic systems as assurance that they will not be impacted by the expansions <br />to structures and pavement on the property. As with past policy, the development permit <br />should obligate the perm/nee to participate in a petition for a feasibility study of sewer and <br />water improvements, if and when it is presented. <br /> <br />Landscaping and Screening: Landscaping is proposed along the south end of the proposed <br />body shop delivery/estimate center and between the existing sendce center structure and the <br />2-suite expansion area. The types of plant materials to be established have .not been <br />indicated. The contractor erroneously filled in the proposed landscaped area adjacent to the <br />liquor store with cement. The developer has indicated that potted plantings will be used to <br />landscape that area by the liquor store. <br /> <br />Archi~¢¢gzr~.t Design: City Code requires exterior walls to be of materials that are 100% <br />other than metal. The developer has just recently refaced the exterior wails of the strip <br />center with stucco. All expansion areas to the strip center will also be faced with stucco. <br />The body shop delivery/estimate center is proposed to be faced with standard lap siding. <br /> <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />! <br />I <br />I <br />I <br /> I <br /> I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.