My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/23/1993
Ramsey
>
Public
>
Agendas
>
Council
>
1993
>
Agenda - Council - 11/23/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 3:55:22 PM
Creation date
4/13/2004 10:47:15 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/23/1993
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The estimate for the complete priority lighting system is based upon the number of priority <br />intersections in existence in 1991 when the original policy was developed, it is reasonable to <br />anticipate that future developments wilt create additional intersections which would be added to the <br />priority intersection system. An increase of 10% to I5% within the next ten years seems likely. At <br />the present time, the City has expended approximately $14,000 to install 15 priority street lights. It <br />should be noted that at present there is not a designated revenue source sufficient to fund proposed <br />construction. Without such, the program will be delayed. <br /> <br />In addition to the above, the City established a policy in 1991 that all future urban plats will receive <br />"Traditionaire" subd/vision lighting. The developer pays the capital cost and three years operations <br />and maintenance costs prior to filing the subdivision plat. As homes are placed on the utility <br />system a monthly operating charge for street lights is also put into effect. It is expected that this <br />procedure will allow for lot vacancies which will exist beyond the three year period covered by the <br />developer contribution. <br /> <br />Project . Street Lights <br /> <br />Priority A Intersections <br /> <br />Priority B Intersections <br /> <br />Priority C Intersections <br /> <br />1995 $ 2%000 - Street Light Fund <br />1996 $ 33,000 - Street Light Fund <br />1997 $ 24,000 - Street Light Fund <br /> <br />$ 84,000 <br /> <br />MUNICIPAL. FACILITIES IMPROVEMENTS <br /> <br />For a number of years the City of Ramsey has been discussing expanding or replacing the existing <br />Public Works facilities at 142nd Avenue N.W. and Trunk Highway #47. Within this Capital <br />Improvements Program, it is projected that $1.5 million be encumbered in 1996 to either expand or <br />replace this facility or to construct a joint facility with another public or private party. <br /> <br />With continued growth of the community, the Fire Department has been studying the needs and <br />requirements of a satellite facility located in the vicinity of Central Park. Within this Capital <br />Improvements Program, in 1998, such a facility, in addition to an expansion of the apparatus room <br />at the existing facility located at City Hall, is projected at a cost $475,000 out of the General Fund. <br /> <br />A $750,000 projection has been made for 1996 out of the General Fund for expansion of the <br />existing police facilities. It is contemplated, at this time, that the issue of expansion of both the <br />police and fzre facilities and siting of a satellite fzre facility would be taken up with the voters <br />through a referendum but that planning and needs studies for such should occur beginning in the <br />1994/1995 time frame. It is further contemplated that the public works facility, projected herein as <br />a 1996 project, either be a referendum project, one conducted by the Economic Development <br />Authority, or a lease/purchase project conducted as a joLnt venture with another party. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.