Laserfiche WebLink
~0nitary Sewer System <br /> <br />County Road #5 - Sanitary Sewer Extension <br /> <br />This project consists of an extension of 8" sanitary sewer for a distance of approximately 600 feet <br />along the west side of County Road #5, south of the Wood Pond Hills subdivision. The project <br />construction cost is estimated at $14,800 and the total project cost including overhead is estimated <br />to be $19,200. <br /> <br />Project Year ERRdJllg <br />County Road #5 1993 $ 19,200 - Assmt / Trunk Fund <br /> <br />$19,200 <br /> <br />Storm Sewer System <br /> <br />Huseby Storm Sewer Project <br /> <br />This project would take drainage from the north side of Highway #10, west of Ramsey Boulevard <br />N.W., and drain it to the Mississippi River through the Huseby property which is the future site of <br />the Mississippi West Regional Park. The drainage area north of this location had experienced <br />flooding in the mid-1980's. The estimated cost of the project is roughly estimated to be $400,000. <br />There has been a commitment by the Department of Transportation to cost share in this project as it <br />will be draining a portion of Trunk Highway #10. <br /> <br />Project - Storm Sewer <br />Husby / Highway #10 <br /> <br />1999 <br /> <br />$ 200,000 - Storm Sewer Fund <br /> <br />$ 200,000 <br /> <br />Street Li~,ht System <br /> <br />The City's priority intersection street lighting system includes placing a cobra head light at all <br />intersections of State trunk highways, county roads and arterial City streets. A four tiered priority <br />schedule was established for this system. A current estimate for the installation and annual <br />operation of the system is presented below: <br /> <br /> Estimated Installation Ann~al Operation & <br />Priori .ty Level ,~[0~.LI,~F.I~ Costs Maintenance Costs <br /> <br />A 18 $27,000 $1,620 <br />B 41 $33,000 $3,690 <br />A, B & C 57 $24,000 $5,130 <br />Complete 137 $ 84,000 $12,330 <br /> <br /> <br />