Laserfiche WebLink
1994-2000 CAPITAL IMPROVEMENT PROGRAM <br />By: Ryan R. Schroeder, City Administrator <br /> <br />CASE # 4 <br /> <br />Background: <br /> <br />On November 2, 1993, Staff distributed to Council the enclosed memorandum dated October 29, <br />1993, explaining the 1993-1995 years of the Capital Improvement Plan progress. On December <br />14, 1993, City Council will consider adoption of the 1994 General Fund Budget including the <br />1994 Capital Improvement/Capital Outlay budget. <br /> <br />Previously, Council had directed that the second December meeting be cancelled. Therefore, it is <br />expected that December 14, 1993, will be a lengthy meeting. Hence, this case is placed on this <br />meeting. As described in the CIP summary within the plan document itself (enclosed separately) <br />adoption of the CIP means that you are in general agreement with the projects and schedule noted <br />in the plan. It does not result in approval of the 1994 budget for the 1994 improvements. This, <br />hopefully, will occur with budget adoption in December. <br /> <br />The enclosed plan forecasts improvements through the year 2000. The recently adopted funding <br />policies are also contained in the plan. Cash flows which project from where planned expenditures <br />will occur follow the adopted policies. Improvements are shown in each of the areas of parks, <br />streets, utilities, and municipal buildings. THE highlight of this plan is that each non -general fund <br />projected improvement has an identified funding source and allocation already identified and <br />available through the year 2000 (assuming project estimates are accurate). <br /> <br />The plan provides for construction of McYdrdey Street projects, Sunwood Drive, and 153rd/155th <br />Avenue N.W. It also provides for funding of Trunk Highway #47 improvements, Riverdale <br />Drive, and a three-year, street paving program. It allocates $120,000 in 1994 and 1995 toward <br />park improvements and $80,000 annually thereafter, plus new subdivision improvements. It <br />projects an additional well, funded in 1995, with a second water tower in 1998. The plan projects <br />construction of a public works/police facility in 1996. In order for this to occur, however, it is <br />projected that the tax levy will need to increase in 1995 and 1996 similar to the past two years. A <br />fire satellite station is projected in 1998. However, current cost estimates will likely delay this <br />proposed general fund expenditure which was originally projected at a much lower cost than <br />appears will be the case. <br /> <br />Council Action: <br /> <br />Motion to adopt Resolution ~93-11- <br />Program. <br /> <br />approving the 1994 - 2000 Capital Improvements <br /> <br />Reviewed by: <br /> <br />Ci~ Administrator <br /> <br />CC:i 1-23-93 <br /> <br />Copies also distributed to: <br /> <br />Finance Officer <br />Pohce Chief <br />Fire Chief <br />City Engineer <br /> <br />Public Works Super~4sor <br />Parks/Utilities Coordinator <br />Zoning Administrator <br />Project Manager <br /> <br /> <br />