My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/14/1993
Ramsey
>
Public
>
Agendas
>
Council
>
1993
>
Agenda - Council - 12/14/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 3:55:31 PM
Creation date
4/13/2004 11:01:16 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/14/1993
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
it of Ra PHONE (6,2)427-,410 <br /> y msey .,× (612)427-55'3 <br /> 153 NOWTHEN BOULEVARD N.W.. RAMSEY. MINNESOTA 55303 - TDD (612) 427-8591 <br /> <br />October 27, 1993 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> I <br />I <br /> <br />Mr, Dan Karst, Jr. <br />Danny's Aluminum Processing, Inc. <br />14050 Basalt St. N.W. <br />Ramsey, MN 55303 <br /> <br />Re: Operations of facility <br /> <br />Dear Dan: <br /> <br />On March 9, 1993, the Ramey City Council approved the issuance of an amended conditional use <br />permit to allow for the disassembly of engines and transmissions within the building at your <br />aluminum processing facility on Lot 1. On the 22nd of June, 1993, the Ramsey City Council <br />approved your request for a conditional use permit to disassemble engines and transmissions and <br />conduct wholesale activities on Lots 2, 3 and 4. Enclosed for your records are fully executed <br />copies of the findings of facts and the conditional use permits that were approved. Also enclosed <br />for your records is a copy of the Site Plan Development Permit issued for the construction of the <br />new building on Lots 2 and 3. Upon providing the City with the $46,680.00 financial guarantee, I <br />wilt authorize the Building Official to release the building permit for the structure. <br /> <br />Since these proceedings began in March, I have received 10 incident reports and/or complaints <br />regarding your operations. As you recall, obtaining the conditional use permit for Lots 2, 3 amd 4, <br />and site plan approval for your new building hinged on your improving the condition of premises <br />on all four lots. You did put forth'the effort and your requests were approved. Since then, I have <br />been observing your operations and the condition of premises has been steadily declining at an <br />alarming rate. This situation is unacceptable and constitutes violations of both of your conditional <br />use permits, at a minimum, in the following areas: <br /> <br />1. Preparation of feedstock outside of opaguely screened areas. <br /> <br />2. Deterioration of required 90% opacity screening. <br /> <br />3. Storage of feedstock and other materials not screened from adjoining properties. <br /> <br />4. Outside storage of debris, inoperable equipment and vehicles. <br /> <br />5. Use of trailers for long term storage. <br /> <br />6. Operations on Lots 2, 3 and 4 are not being conducted wholly within a building. <br /> <br />Traffic not being controlled so as to avoid congestion of public right-of-way and <br />traffic hazards. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.