My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/13/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 01/13/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:59:08 PM
Creation date
6/10/2015 2:18:03 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/13/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.EXISTING CONDITIONS <br />3.1Existing Pavement and Soil Conditions <br />In May of 2014,Northern Technologies, Inc. (NTI)was employed to complete a Geotechnical <br />Evaluation Report for this proposed project. This included completing four(4)soil borings <br />th <br />along Garnet Street and 168Avenue, which included two (2) borings along Garnet Street, and <br />th <br />two (2) borings along 168Avenue.The locations of these borings are shown in the Boring <br />Location Diagram in Appendix C of NTI’s Geotechnical Evaluation Report, which isattached in <br />Appendix D. <br />Information obtained from the soil borings was needed to determineexisting bituminous <br />pavement and aggregate base thicknesses,subsurface soil conditions, and potential difficulties <br />anticipated during construction,as well as for providing recommendations for excavations, site <br />preparation, engineered fill and compaction, depths of unsuitable soils to be removed, ground <br />water management, and pavement design parameters.The borings terminated at nominal depths <br />of 10 to 20 feetbelow the existing ground surface. <br />Groundwaterwas observed insoil borings SB-1 and SB-2 at depths ranging from 17 to 19 feet <br />belowexisting grade, respectively, corresponding to elevations of 867.4 and 870.0 feet. Based <br />ontheserecorded water leveldepths, groundwater is not anticipated to be asignificant issue for <br />any work completed with thisproposed project, regardless of whether utilities work is included <br />with the project or not.However, excavationsextending into sand layers over clay or silt-based <br />soilsmay encounter perchedgroundwaterwhich can be effectively controlled by excavating <br />sump pitsand removingwater from the trenches with pumps.This report therefore assumes that <br />dewatering will not be an issue during construction,and that sump pumps willbe sufficient for <br />any necessary dewatering. <br />The soil borings generally indicate that existing bituminous pavement thicknessesalong both <br />streets range from 1½ to 2 inches, that the existing aggregate base thicknessesrange from 2 to 3 <br />inches, and that the existing subgrade soils below the pavement sectionsgenerally consist of <br />sand (SP), silty sand (SM), clayey sand (SC), and sandy clay (CL). It was also observed that the <br />relative density of the granular fill throughout the project area was generally very loose to <br />medium dense, and that the clay-based fill generally had a medium consistency. <br />Several non-typical conditions were also observed. Fill consisting of sandy clay with trace <br />organics was encountered in soil boring SB-1 ranging from 0 to 2 feet below the pavement <br />section. The silty sand fill was also wet from 2 to 4 feet below the ground surface in boring SB- <br />2. The underlying native clay below the silty sand fill was generally soft, and soft to medium <br />high plasticity clay (CH) layers were encountered below the previously placed fill in soil boring <br />SB-2 from 11.5 feet to 17 feet below existing grade. Theconsistency of this material was soft. <br />NTI’s report states that the stable non-organic fill and native alluvial soils are generally suitable <br />for supporting utilities construction. However, NTI recommends removing any organic soils <br />and/or unstable clays if encountered below the inverts of any utilities that may be installed with <br />the project.NTI also recommends that the Geotechnical Engineer of Record (NTI) or their <br />designated representative observe allproject excavations to determine that anyunsuitable soils <br />have been properly removed and that proper bearing support is provided by the exposed soils. <br />Feasibility Report <br />th <br />Garnet Street and 168Avenue Reconstruction <br />City of RamseyProject No. 13-10 <br />Page 5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.