My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/13/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 01/13/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:59:08 PM
Creation date
6/10/2015 2:18:03 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/13/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.FINANCING <br />5.1Opinion of Cost <br />AppendixB <br />A detailed opinion of probable costsfor the proposed improvements can be found in <br />of this report. <br />The opinion of probable costsincorporatesanticipated 2015construction costs for the proposed <br />streetimprovementsandassociated grading, curb and gutter, driveway, storm sewer, sidewalk, <br />turf establishment, erosion control, mailbox, and signing and striping improvements, as well as a <br />10% constructioncontingency and 25% indirect costsfor administrative, engineering, financing <br />and legal costs.Costs for public utilities (watermain and sanitary sewer) are also included in the <br />opinion of probable costs, but are tabulated separately. Summarytables of the estimated project <br />Tables 1and 2 <br />costs for Garnet Street and 168th Avenueareshown belowin . <br />City staff prepared the Feasibility Report in-houseas part of staff’s normal duties. NTI prepared <br />the attached Geotechnical Evaluation Report at a cost of $. <br />TABLE 1 <br />EstimatedProject Costs-Garnet Street <br />SCHEDULETOTAL <br />Schedule A –Surface Improvements$682,000 <br />Schedule B –Storm Sewer Improvements$146,000 <br />Schedule C –Water Main Improvements$173,000 <br />Schedule D –Sanitary Sewer Improvements$124,000 <br />TOTAL PROJECT COST–GARNET STREET$1,125,000 <br />TABLE 2 <br />th <br />Estimated Project Costs –168Avenue <br />SCHEDULETOTAL <br />Schedule A –Surface Improvements$354,000 <br />Schedule B –Storm Sewer Improvements$52,000 <br />Schedule C –Water Main Improvements$98,000 <br />Schedule D –Sanitary Sewer Improvements$46,000 <br />TOTAL PROJECT COST –168TH AVENUE$550,000 <br />Feasibility Report <br />th <br />Garnet Street and 168Avenue Reconstruction <br />City of RamseyProject No. 13-10 <br />Page 15 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.