My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/13/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 01/13/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:59:08 PM
Creation date
6/10/2015 2:18:03 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/13/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRELIMINARY ENGINEER'S ESTIMATE Prepared by: Bruce Westby, P.E. <br />Proposed Construction Year: 2015 <br />GARNET STREET RECONSTRUCTION (1,350 LF) <br />NOW THEN ESTATES <br />CITY OF RAMSEY <br />JANUARY 8, 2015 <br />SUMMARY OF STREET CONSTRUCTION COST <br />TOTAL STREET CONSTRUCTION$496,378.68 <br />TOTAL STORM SEWER CONSTRUCTION$106,100.00 <br />10% CONTINGENCY$60,247.87 <br />ENGINEERING (18%) AND ADMINISTRATIVE AND LEGAL (7%)$165,681.64 <br />TOTAL ESTIMATED STREET PROJECT COST$828,408.19 <br />SCHEDULE C: SANITARY SEWER <br />UTILITY DEWATERING10LS1 <br />$5,000.00$5,000.00 <br />8" PVC SDR 351,1600LF2,000 <br />$45.00$52,200.00 <br />4" PVC SDR 263003LF400 <br />$30.00$9,000.00 <br />SANITARY MANHOLE W/ FRAME AND CASTING50EA9 <br />$3,500.00$17,500.00 <br />CONNECT TO EXISTING20EA2 <br />$1,200.00$2,400.00 <br />8" X 4" WYE100EA11 <br />$250.00$2,500.00 <br />TELEVISE COMPLETED SANITARY PIPE1,4600LF2,400 <br />$1.00$1,460.00 <br />TOTAL SANITARY SEWER CONSTRUCTION$90,060.00 <br />SCHEDULE D: WATERMAIN <br />6" WATERMAIN DUCTILE IRON CLASS 531600LF700 <br />$50.00$8,000.00 <br />8" WATERMAIN DUCTILE IRON CLASS 521,1400LF1,400 <br />$65.00$74,100.00 <br />1" TYPE K COPPER WATERMAIN3003LF500 <br />$25.00$7,500.00 <br />1" SERVICE GROUP100EACH11 <br />$250.00$2,500.00 <br />6" GATE VALVE & BOX30EACH1 <br />$1,500.00$4,500.00 <br />8" GATE VALVE & BOX40EACH4 <br />$1,800.00$7,200.00 <br />FURNISH & INSTALL HYDRANT30EACH6 <br />$4,000.00$12,000.00 <br />WATERMAIN FITTINGS1,0500POUND1,500 <br />$6.00$6,300.00 <br />4" INSULATION250SY25 <br />$35.00$875.00 <br />CONNECT TO EXISTING WM20EACH2 <br />$1,250.00$2,500.00 <br />TOTAL WATERMAIN CONSTRUCTION$125,475.00 <br />H:\\Cases\\CC\\2015\\1-13-15\\Garnet&168thAve Engrs Est Feas Rpt FINAL PDFPage 2 of 6 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.