Laserfiche WebLink
Review File: Fire Station No. 2 <br />Preliminary Plan Review <br />Engineering Review <br />November 24, 2014 <br />Page 2 of 2 <br /> <br /> <br />5.Consider placing EOF for dry pond in CBMH 3. Invert must be set above 100 year high <br /> <br />water level. <br /> <br />Sheet C301 <br /> <br /> <br />1.Plans for retaining wall must be signed by an engineer. <br /> <br />2.Topsoil must meet the Ramsey specifications. <br /> <br />3.The cross slope on sidewalks and trails at driveways must not exceed 2%. <br /> <br />4.Label slopes on paved surfaces. <br /> <br />5.It is recommended that the project provide a depressed area south of car parking lot for <br />infiltration/ snow storage. Contours along south edge do not depict surmountable/ ribbon <br /> <br />curb. <br /> <br />Sheet 401 <br /> <br /> <br />1.Rock construction entrances are ineffective for removing Ramsey soils from tires. Add <br /> <br />notification by City that soils must be removed from adjacent streets. <br /> <br />2.Verify date of geotechnical report. <br /> <br />Sheet 501 <br /> <br /> <br />1.Sediment Control Inlet Hat shall not be used in paved areas. <br /> <br />2.Concrete thrust blocks are not required. Mega-lugs are required on all joints. <br /> <br />3.Intent of biolog detail is not clear. <br /> <br /> <br />