My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/28/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 04/28/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:03:54 PM
Creation date
6/11/2015 8:19:15 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/28/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
651
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: <br />Brookfield 6th Addition. <br />Page 2 of 2 <br />• A two (2) year maintenance surety would be required to ensure the survival of the transitioning <br />plantings. <br />• Minimum tree size for transitioning plantings are 2.5 inches for overstory (shade) trees, 1.5 <br />inches for ornamental trees, and six (6) feet in height for evergreen trees. <br />A revised Landscape Plan must be submitted to address the above items prior to the plat being released <br />for recording. <br />Tree Preservation: The site appears to be devoid of any significant trees and thus, a Tree Preservation <br />Plan is not required. <br />Topsoil: Each individual lot will need to have four (4) inches of topsoil meeting the City's topsoil <br />specification. A topsoil inspection is required prior to landscaping being installed and copies of the load <br />tickets are required as well. This is reviewed at time of Building Permit Application and request for <br />Certificate of Occupancy for each individual lot. <br />
The URL can be used to link to this page
Your browser does not support the video tag.