My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/28/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 04/28/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:03:54 PM
Creation date
6/11/2015 8:19:15 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/28/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
651
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF RAMSEY LAND USE APPLICATION <br />TECHNICAL REVIEW FILE <br />DATE <br />APRIL 24, <br />2015 <br />PROJECT ADDRESS <br />EAST OF MARBLE STREET, <br />SOUTH OF 170TH TRAIL <br />PROJECT. TITLE <br />BROOKFIELD 6TH ADDITION FINAL PLAT <br />ESCROW # <br />114635 <br />DEPARTMENT: <br />Engineering <br />TECHNICAL REVIEWER: <br />Name: Leonard Linton <br />Phone: 763 433-9834 <br />Email: llinton@ci.ramsey.mn.us <br />We offer the following comments regarding the Final Plat for Brookfield 6th Addition. The <br />submittal consists of 11 sheets prepared by APA Consulting Engineers dated March 23, 2015. <br />Plan sheet specific comments. <br />Plat: The plat name must be updated in the 2nd paragraph and the County Recorder paragraph. <br />Sheet Cl: The title must be updated to 6th Addition. <br />Sheet C2: <br />• Label Marble Street at west end of project. <br />• Add detail for ped ramp removal and replacement. <br />• Install temporary hydrant or provide means to flush watermain at south end of 167th <br />crossing. <br />• Show alternate for connection to existing 168th Ave. The City will be reconstructing 168th <br />Ave east of the property line. There will not be a cul-de-sac when both projects are <br />completed. The connection must be coordinated between contractors. <br />• Verify grading in easement between Block 1 Lots 8 & 9. <br />• Fix readability for services on lot 7. <br />• Show 6' sidewalk along north side of 168th Avenue. <br />• Lighten Storm Sewer line weight. <br />Sheet C3: <br />• Show profile grid for CB 105 -CB 106. <br />• Darken labels for storm sewer structures. <br />• Make hydrants lighter and show watermain with light pen. <br />• All sidewalks are 6' wide. <br />• Show profile grid for CB 107 -CB 108, show details for connection north of CB 108. <br />
The URL can be used to link to this page
Your browser does not support the video tag.