Laserfiche WebLink
alternative and shall comprise a minimum of fifty (50) percent of the non -glazed wall area. Calculations shall be <br />provided for brick and stone for each elevations. <br />Full colored elevation plans should be provided. The combination of composite and steel in the differing patterns <br />divides the floors and sections of the building. Multiple sections of the building are articulated to break up the flat <br />wall. In addition windows and decks are proposed for each unit that provide further breaks in the building wall <br />design. Additional information is required for the specific appearance of the individual air conditioning units. Staff <br />is concerned over the appearance, color, size and overall look of units on each elevation. <br />The south elevation includes garage doors for tuck under garages. Garage doors shall be in colors that are <br />complementary to the main building materials. The roof design is pitched with asphalt shingles. The elevation <br />facing Ramsey Parkway is actually the rear of the building and contains the same materials as the front. The first <br />floor contains windows to create street -level interest and pedestrian scale along this street frontage. The northern <br />elevation does include an entrance for the building. <br />Five detached garage buildings are planned in the southern portion of the site. Three long buildings each containing <br />16 stalls are located in a row along the south property line with two additional buildings just north of this row <br />containing 22 stalls each. The garage buildings contain the same materials as the apartment building. The roofs are <br />pitched with additional accenting so that they are of a higher design standard than typical detached structures. The <br />materials will include stone, horizontal lap siding, shake siding and an asphalt shingle roof. The sides will contain <br />the stone and horizontal siding. The additional roof treatments and glass demonstrate a good effort in enhancing the <br />design of these detached structures. The use of stone at the base will help improve the longevity of these structures. <br />Staff would recommend considering all brick or stone on the back side of these garages in lieu of any lap siding. <br />Although the garages will eventually be screened by future buildings, that timeline is undetermined. The <br />Environmental Policy Board recommended additional landscaping along this wall to soften the view. The EPB <br />noted that the number of plantings along public streets could be reduced to off -set the suggested plantings along the <br />southern garages. <br />Funding Source: <br />All costs associated with processing this Application are the responsibility of the Applicant. <br />Recommendation: <br />The Planning Commission recommends approval of the request with required revisions as outlined in the Staff <br />Review Letter. <br />The Planning Commission did have significant discussion about the original vision of the COR -1 Sub -District, <br />especially as it relates to the definition of mixed-use in addition to managed parking. The original Ramsey Town <br />Center placed a higher emphasis on vertically mixed uses within buildings. The revision to the Master Plan in 2012 <br />shifted to more of a focus of mix of uses within a single block. The proposed building does not include a retail <br />component, but does sit on a block with multiple other uses including retail and office. <br />The Planning Commission requests an opportunity to meet with the City Council in a Joint Work Session to discuss <br />clarification and potential language changes to rectify a perceived disconnect between the Development Plan and <br />language contained within the Design Framework. The Planning Commission desire the City Council's thoughts on <br />the vision of The COR to potentially revise zoning language to better clarify said vision. <br />Action: <br />Motion to recommend that the City Council adopt Resolution #15-04-093 granting Preliminary Plat and <br />Preliminary Site Plan Approval for COR Parkview Addition/Parkview East, with required revisions as outlined in <br />the Staff Review Letter. <br />NOTE: this is not final approval of the project. The Developer will need to satisfy the contingencies of the approval <br />of Preliminary Plat and Preliminary Site Plan. In addition, the Developer will need to secure Final Plat and Final <br />Site Plan approval. <br />