My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/12/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 05/12/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:04:18 PM
Creation date
6/11/2015 8:49:59 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/12/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Harvest Estates (15153 Nowthen Blvd. NW) <br />Final Plat <br />May 7, 2015 <br />Page 5 of 6 <br />nd <br />Only a portion of 152 Lane (proposed <br />Northern street) will be able to be <br />constructed with the current phasing plan <br />due to existing buildings. Interim Step #1 <br />of the current phasing plan would utilize <br />the existing parking lot for the former <br />-de- <br />Interim Step #2 of the current phasing plan <br />in the event of delay of Phase II would be <br />to construct an actual cul-de-sac at the end <br />nd <br />of 152 Lane for Phase I. As the City is <br />-de-sacs can be <br />challenging. There are ten (10) lots <br />nd <br />proposed on 152 Lane in Phase I. <br />nd <br />All of 152 Avenue (proposed Southern <br />street) will be able to be constructed as <br />designed without impacts to existing <br />buildings or need for temporary cul-de- <br />sacs. There are fourteen (14) lots proposed <br />nd <br />on 152 Avenue, all created in Phase I. <br />Additionally, there are seven (7) lots <br />proposed to be created along existing <br />Helium Street. <br />Historically, the City sees an average of ten (10) to twenty (20) lots per development constructed each year in the <br />current market environment. City Staff has received this feedback from a number of local developers as well. Twenty- <br />nd <br />one (21) lots would be created with the construction of 152 Avenue and lots created along existing Helium Street. <br />nd <br />The benefit to the City would be to avoid a phased construction of 152 Lane, avoiding construction staging conflicts <br />and temporary cul-de-sac conditions. The benefit to the Developer would be a lower Financial Guarantee requirement <br />and cost-savings in construction staging and reconstruction. T <br />City the tools to require full cul-de-sac construction and associated rights-of-way. If the City were to require full cul- <br />de-sac construction and associated right-of-way, two (2) lots would need to be removed from Phase I. <br />Nonetheless, Staff supports the phasing plan as presented, but simply desired to identified the various alternatives <br />that exist to avoid potential conflicts. <br />Grading Plan <br />Development of the Grading Plan has discovered the need for more imported fill to be required than anticipated by <br />the Developer in order to obtain the mix of floor plans desired by the Developer. The geographic area of impact is <br />focused on the future Phase II. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.