Laserfiche WebLink
CITY OF RAMSEY LAND USE APPLICATION <br />TECHNICAL REVIEW FILE <br /> <br />D 4/3/15 U <br />P <br />ATEROJECT NKNOWN <br />A <br />DDRESS <br />RM8,2015 <br />EVISED AY <br />P. HE <br />ROJECT TITLE ARVEST STATES <br />E# 114538 <br />SCROW <br />D: Community Development: Planning Division (Landscape Plan & Environmental <br />EPARTMENT <br />Resources) <br />Name: Chris Anderson <br />TR: <br />Phone: 763-433-9817 <br />ECHNICAL EVIEWER <br />Email: canderson@cityoframsey.com <br />We offer the following comments regarding the Landscape and Tree Preservation Plans prepared by <br />Hedlund and dated March 5, 2015, revised April 29, 2015: <br />Tree Preservation <br />: At least forty percent (40%) of the Diameter at Breast Height (DBH) inches of <br />significant trees shall be preserved. For every one (1) inch of significant tree DBH removed beyond this <br />threshold, 1.25 inches of DBH shall be replanted or $125.00 shall be paid to the City in restitution (or <br />some combination thereof). Invasive species, diseased trees, and trees removed for stormwater ponds, <br />public trails and sidewalks, shall not be considered when calculating the removal threshold (they should <br />be noted as such in the inventory to receive credit). <br />Sheet C-5 indicates that there is a total of 1,435 total DBH on site (this excludes all invasive species, <br />primarily Siberian Elm) and of that, 1,360 DBH inches will be removed (five percent \[5%\] of significant <br />tree DBH inches preserved). Thus, reforestation (and/or restitution) should equate to 624 inches (1360- <br />861=499 inches beyond removal threshold x 1.25”). However, the reforestation requirement exceeds the <br />base landscape requirement (two \[2\] trees per lot) and per the direction of the Environmental Policy <br />Board, the greater of the base landscape requirements or the reforestation requirement (reduced by the <br />base landscape requirement) shall apply. This results in a total of 400 inches of required reforestation. <br />As proposed landscaping is being used to satisfy the reforestation requirement, all trees installed on the <br />site shall be a minimum caliper of two and one half inches (2.5”) as that was the caliper used to meet the <br />requirement. All builders shall be made aware of this size requirement as it is greater than the City’s <br />minimum planting size requirement. <br />The following revisions are still needed: <br />Sheet CG-1.0 and CG-1.1 must be revised as follows: <br />Tree save fencing must be shown on the grading plan and shall be installed at or beyond <br />o <br />the dripline of trees or groups of trees being preserved. Tree save fencing shall be <br />installed and maintained in a plumb condition throughout all land disturbance activities. <br />Sheet CE-1 must be revised as follows: <br />In the drainage basins, utilize MnDOT Mix 35-221 or similar, which is a native seed mix, <br />o <br />consistent with recommendation from the Environmental Policy Board. <br /> <br />