My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/12/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 05/12/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:04:18 PM
Creation date
6/11/2015 8:49:59 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/12/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF RAMSEY LAND USE APPLICATION <br />TECHNICAL REVIEW FILE <br /> <br />D M8,PA, <br /> <br />ATEAY ROJECT DDRESS SOUTH OF SUNWOOD DRIVE <br />2015 , <br />NORTH OF VETERANS DRIVE <br />R <br />WEST OF ESIDENCE AT THE <br />COR <br />P. SV <br />ROJECT TITLEUNWOOD ILLAGE <br />E# 114596 <br />SCROW <br />D: Engineering <br />EPARTMENT <br />Name: Leonard Linton <br />TR: <br />Phone: 763 433-9834 <br />ECHNICAL EVIEWER <br />Email: llinton@ci.ramsey.mn.us <br /> <br />We offer the following comments regarding your request for the Site Plan Approval of the <br />Sunwood Village Apartments. The submittal consists of 14 sheets prepared by Miller Hanson <br />Partners dated March 3, 2015, revised April 27, 2015. The Civil Sheets were prepared by Loucks <br />Associates. <br /> <br />Grading, Drainage, Demolition and Utility Plans: <br /> Preliminary grading, drainage, demolition <br />and utility plans have been prepared for this site plan by Loucks Associates. Staff offers the <br />following general comments on these plans: <br /> <br /> <br />1.There is an active sidewalk along the north side of the lot. A pedestrian detour plan must <br />be prepared and submitted to the City prior to release of the building permit. The plan <br />must conform the latest guidance available from the MNDOT website. The detour must <br />remain in place until the sidewalk is restored. <br /> <br />2.The benchmark information note must be fully visible on all sheets. <br /> <br />A permit from the Lower Rum River Water Management Organization (LRRWMO) will be <br />required. The project is within the 10 year capture zone of a municipal well. Infiltration is not <br />permitted in the 10 year capture zone. Alternative volume reduction strategies will need to be <br />investigated and documented per the LRRWMO rules. <br /> <br />Submit a copy of the MPCA Construction stormwater permit to the City prior to construction. <br />Submit copies of erosion inspection results to the City prior to Certificate of Occupancy. <br /> <br />A graphical reference to the benchmark for the site must be added to the sheets in addition to the <br />description already shown. <br /> <br />Revise and resubmit storm water model. Add line from CB 100 to existing structure to model. <br />Use East invert in CB 100 as starting water elevation of Cistern for 10 and 100 year simulations. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.