My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/12/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 05/12/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:04:18 PM
Creation date
6/11/2015 8:49:59 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/12/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Sunwood Village Apartments <br />Site Plan Request <br />Engineering Review <br />Page 2 of 4 <br /> <br />Utilities: <br /> The building will be served by municipal sewer and water extended from Sunwood <br />Drive. Construction plans and specifications are subject to review of the City Engineering <br />Department. <br /> <br />Stormwater Pollution Prevention Plan: <br /> Hydraulic Grade calculations must be submitted for the <br />storm sewer system. A copy of the stormwater calculations provided to the LRRWMO for plan <br />approval must be submitted to the City. <br /> <br />Sheet Specific Comments: <br /> <br />C1-2 <br /> The notes along the right edge of the frame are cutoff. The full text must be visible. <br /> <br />Pavement removal is shown along the existing driveways. The driveways serve an active <br />building. Advance notice must be provided to the owner of the building prior to <br />commencing demolition work. One access may be closed for a short period while sawing <br />and removing the existing pavement. <br /> <br />A minimum 8 ft. driving lane must be available except as noted above. <br /> <br />Both driveways must be restored at the end of each working day. <br /> <br />Barriers must be installed to delineate the edge of the driveway. <br /> <br />The functionality of the catchbasin to be removed must be maintained until the new storm <br />sewer system is functional. <br /> <br />C2-1Show protective fence around existing planting beds and maintain until construction <br /> <br />is finished. <br /> <br /> <br />A temporary pedestrian access route (TPAR) plan must be included in the plan set and note <br />6 must reference the TPAR. <br /> <br />Move text to eliminate overlaps. <br /> <br />C3-1 <br /> The dark heavy line on the northeast driveway does not match the legend. The driveway <br />removal and replacement limits must be consistent between sheets. <br /> <br />Rock Construction Entrances are ineffective in Ramsey. Add the following text to the <br />from the CITY <br />notice <br /> premium <br />4 inches of <br /> directed by CITY <br />left idle for day, weekends and holidays, or as <br /> <br />The proposed grades in the grass area east of the building are less than 2 percent. City code <br />requires an as-built grading plan prior to issuing the Certificate of Occupancy for all lots <br />with grades less than 2 percent on pervious areas. <br /> <br />C3-2 <br /> The Stormwater Pollution Prevention Plan must be revised to include an area map showing <br />the Mississippi River. The Contents of the sheet must match the requirements of the Construction <br />Stormwater Permit. <br /> <br />Revise the SWPPP to conform to the requirements of the MPCA Construction Stormwater <br />permit. This site is within 1 mile of the Mississippi river and Appendix A applies. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.