Laserfiche WebLink
PHASE I <br /> <br />Install brick ties 2,000 <br />Remove existing door, provide temporary weatherproof 4,000 <br />enclosures as required <br />Rafter and ceiling joist modifications 1,500 <br />Duct runs 3,500 <br /> <br />Total $11,000 <br /> <br />PHASE II <br /> <br />At north and south sofit, equally spaced in length of 250 <br />brick wall painted to match <br />Install insulation baffles and blow in attic insulation 1,020 <br />Rebuild opening as required for new door and frame 2,000 <br />Paint exterior wood surfaces 1,500 <br /> <br />Total $4,770 <br /> <br />PHASE III <br /> <br />Close opening at pass through 1,500 <br />Widen rough door opening to accommodate new 1,000 <br />scheduled door and frame removed walls as required <br />Remove flooring and sub-flooring down to joists and 2,000 <br />install new ~" plywood sub-floor <br /> <br />Total $4,500 <br /> <br />PHASE IV <br /> <br />Strip paint and refurbish all salvaged trim components. 9,100 <br />Install wainscot, chalkboards, and new and refurbished <br />wood trim. Supplement refurbished trim of same profile <br />as required. <br />Remove existing damaged portion of existing wood 8,256 <br />flooring and replace with new flooring and finish <br />Install metal ceiling and metal cove trim 5,226 <br />Install finishes and toilet accessories at toilet room 1,500 <br />Paint all walls, ceilings, wood doors, trim, and windows 300 <br />etc. <br />Install handrails at basement stair wall 6,}90 <br />Install two rooms of antique wire hooks on existing trim 100 <br />attached to south wall <br />Complete mechanical and electrical rooms 11,510 <br /> <br />Total $42,382 <br /> <br />P. 5 <br /> <br /> <br />