My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/14/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 07/14/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:06:09 PM
Creation date
7/17/2015 1:44:52 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/14/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our Mistionc To work together to reipoiibly grew our comma nityr, and to provide quality, cert-oliBcdwe, and efficient government services. <br />CC Regular Session 7. 3. <br />Meeting Date: 07/14/2015 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title: <br />Adopt Resolution #15-07-174 Accepting Bids and Awarding a Contract for 2015 Street Maintenance Program <br />Division B, Overlay Improvements; Improvement Project #15-00 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to accept bids and award a contract for Division B of the 2015 Street Maintenance <br />Program, overlay improvements. <br />Background: <br />As part of the city's long-term Street Maintenance Program, various city streets receive overlay improvements each <br />year to help maximize the life expectancy of street pavement sections. Overlaying streets helps to restore a portion <br />of the structural integrity of the pavement sections, while also providing some of the benefits received from <br />crackseal and sealcoat improvements. <br />The 2015 Street Maintenance Project proposes to overlay approximately 3 miles of bituminous surfaced public <br />streets in various locations throughout the City. Attached are Exhibits A through C which show the locations of all <br />streets proposed to be improved with Division B of the 2015 Street Maintenance Program. <br />Bids were opened on July 9th. A total of seven bids were received and were checked for errors and omissions. No <br />adjustments were required. The bids received were competitive and favorable. A tabulation of the seven bids <br />received is below. <br />CONTRACTOR <br />TOTAL <br />BID <br />Hardrives, Inc <br />$311,312.19 <br />Rum River Contracting Co. <br />$329,868.04 <br />North Valley, Inc. <br />$332,460.03 <br />Park Construction Company <br />$332,516.00 <br />Midwest Asphalt Corporation <br />$343,418.00 <br />Northwest Asphalt, Inc. <br />_ <br />$348,934.66 <br />Valley Paving, Inc. <br />$369,249.44 <br />Engineer's Estimate <br />$379,623.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.