My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 07/28/2015
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2015
>
Agenda - Council Work Session - 07/28/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:06:43 PM
Creation date
7/29/2015 8:27:35 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
07/28/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WSB & ASSOCIATES, INC. <br />EXHIBIT C <br />SCOPE OF WORK <br />GENERAL SCOPE OF SERVICES FOR IMPROVEMENT PROJECTS <br />C.1 PRELIMINARY REPORT/STUDY PHASE <br />Subject to further clarification and refinement on a project -by -project basis, the Engineer <br />shall in proper time and sequence: <br />C.1.1 Consult with the Town representative to determine the requirements of the project, <br />review available data, attend necessary conferences, and be available for general <br />consultation. <br />C.1.2 Advise the Town as to the necessity of the Town's providing or obtaining from <br />others data or services and assist the Town in obtaining such data and services. <br />C.1.3 Identify and analyze requirements of governmental authorities having jurisdiction <br />to approve the design of the project and participate in consultations with such <br />authorities. <br />C.1.4 Make such preliminary studies, layouts, or field surveys to verify and supplement <br />existing elevation and topographic information and preliminary cost estimates to <br />clearly identify potential construction or financing problems. <br />C.1.5 Assist the Town in obtaining all required subsurface investigations as required for <br />the preparation of the feasibility report. <br />C.1.6 Prepare a feasibility report on the preliminary engineering study of the project in <br />sufficient detail to indicate the problems involved. The report shall include the <br />desired phased program, if required, and the appropriate alternate solutions. The <br />report will also include schematic layouts, sketches, conceptual design criteria with <br />appropriate exhibits to indicate the considerations involved (including applicable <br />requirements of governmental authorities having jurisdiction over the project), <br />preliminary estimate of project cost, typical examples of proposed assessments <br />preliminary identification of right-of-way and easement requirements, and the <br />Engineer's conclusions and recommendations. <br />C.1.7 Furnish copies of the feasibility report documents and review the feasibility report <br />with Town staff. <br />C.1.8 If required, the Engineer shall present the feasibility report to the proper reviewing <br />agencies and to the Town Board. The Engineer shall attend the public hearing for <br />the project. <br />Exhibit C - Scope of Work Page 1 <br />K:\Personal\Eric Maass \CLIENT\Lent Township\Exh C.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.