My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 07/28/2015
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2015
>
Agenda - Council Work Session - 07/28/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:06:43 PM
Creation date
7/29/2015 8:27:35 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
07/28/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WSB & ASSOCIATES, INC. <br />EXHIBIT C <br />SCOPE OF WORK <br />C.2 FINAL DESIGN PHASE <br />Subject to further clarification and refinement on a project -by -project basis, the Engineer <br />shall, in proper time and sequence: <br />C.2.1 On the basis of the accepted preliminary design documents and the current opinion <br />of probable cost, prepare contract documents consisting of final drawings and <br />specifications to show and describe the scope, extent, and character of the work to <br />be furnished and performed by Contractor(s) including Advertisement for Bids, <br />Instructions to Bidders, Bid Form, Form of Agreement, Performance and Payment <br />Bond Form, General Conditions, Special Conditions, and Technical Specifications. <br />C.2.2 Provide technical criteria, written descriptions and design data for use in filing <br />applications for routine permits or obtaining approvals of such governmental <br />authorities as have jurisdiction to approve the design of the project, and assist the <br />Town in consultations with appropriate authorities. The Engineer shall prepare <br />and submit all permit applications to the appropriate agencies. The Town shall be <br />responsible for alI permit fees. <br />C.2.3 Advise the Town of any adjustments to the latest opinion of probable cost caused <br />by changes in extent or design requirements of the project and furnish a current <br />opinion of probable cost based on the drawings and specifications. <br />C.2.4 Prepare for review and approval by the Town, its legal counsel and other advisors <br />contract agreement forms, general conditions, supplementary conditions, bid <br />forms, advertisement for bid and instructions to bidders, and assist in the <br />preparation of other related documents. <br />C.2.5 Attend necessary conferences and be available for general consultation. <br />C.2.6 Furnish three (3) copies of the above documents and of the drawings and <br />specifications and present and review them in person with the Town, along with <br />completing a plans -in -hand site inspection. Make minor revisions and adjustments <br />as required following review by the Town. <br />C.3 BIDDING PHASE <br />Subject to further clarification and refinement on a project -by -project basis, the Engineer <br />shall in proper time and sequence: <br />Exhibit C - Scope of Work Page 2 <br />K:\Personal\Eric Maass \CLIENT\Lent Township\Exh C.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.