Laserfiche WebLink
Init. <br />Additional Services <br />Responsibility <br />(Architect, Owner <br />orNot Provided) <br />Location of Service Description <br />(Section 4.2 below or in an <br />exhibit attached to this document <br />and identified below) <br />§ 4.1.1 Programming (B202T11-2009) <br />§ 4.1.2 Multiple preliminary designs <br />§ 4.1.3 Measured drawings <br />§ 4.1.4 Existing facilities surveys <br />§ 4.1.5 Site Evaluation and Planning (B203114-2007) <br />§ 4.1.6 Building Information Modeling (E202T14-2008) <br />§ 4.1.7 Civil engineering <br />§ 4.1.8 Landscape design <br />§ 4.1.9 Architectural Interior Design (B252TM-2007) <br />§ 4.1.10 Value Analysis (B204TM-2007) <br />§ 4.1.11 Detailed cost estimating <br />§ 4.1.12 On-site Project Representation (B2O7TM_ <br />2008) <br />§ 4.1.13 Conformed construction documents <br />§ 4.1.14 As -Designed Record drawings <br />§ 4.1.15 As -Constructed Record drawings <br />§ 4.1.16 Post occupancy evaluation <br />§ 4.1.17 Facility Support Services (B210TM-2007) <br />§ 4.1.18 Tenant -related services <br />§ 4.1.19 Coordination of Owner's consultants <br />§ 4.1.20 Telecommunications/data design <br />§ 4.1.21 Security Evaluation and Planning (B206TM- <br />2007) <br />§ 4.1.22. Commissioning (B211TM_.2007) <br />§ 4.1.23 Extensive environmentally responsible design <br />§ 4.1.24 LEED® Certification (B214114-2012) <br />§ 4.1.25 Fast-track design services <br />§4.1.26 Historic Preservation (B205TM-2007) <br />§4.1.27 Furniture, Fumishings, and Equipment Design <br />(B253TM-2007) <br />§ 4.2 Insert a description of each Additional Service designated in Section 4.1 as the Architect's responsibility, if not <br />further described in an exhibit attached to this document. <br />§ 4.3 Additional Services may be provided after execution of this Agreement, without invalidating the Agreement. <br />Except for services required due to the fault of the Architect, any Additional Services provided in accordance with <br />this Section 4.3 shall entitle the Architect to compensation pursuant to Section 11.3 and an appropriate adjustment in <br />the Architect's schedule. <br />§ 4.3.1 Upon recognizing the need to perform the following Additional Services, the Architect shall notify the Owner <br />with reasonable promptness and explain the facts and circumstances giving rise to the need. The Architect shall not <br />proceed to provide the following services until the Architect receives the Owner's written authorization: <br />.1 . Services necessitated by a change in the Initial Information, previous instructions or approvals given <br />by the Owner, or a material change in the Project including, but not limited to, size, quality, <br />complexity, the Owner's schedule or budget for Cost of the Work, or procurement or delivery <br />method; <br />.2 Services necessitated by the Owner's request for extensive environmentally responsible design <br />alternatives, such as unique system designs, in-depth material research, energy modeling, or LEED® <br />certification; <br />AIA Document B101 TM - 2007 (formerly B151*" —1997). Copyright 01974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights <br />reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and international Treaties. Unauthorized reproduction or distribution of <br />this AIAo Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible <br />under the law. This document was produced by AIA software at 10:10:07 on 07/02/2015 under Order No. 8583696391 which expires on 07/01/2016, and is not <br />for resale. <br />User Notes: (3B9ADA20) <br />