Inst. <br />.3 Changing or editing previously prepared Instruments of Service necessitated by the enactment or <br />revision of codes, laws or regulations or official interpretations; <br />.4 Services necessitated by decisions of the Owner not rendered in a timely manner or any other failure of <br />performance on the part of the Owner or the Owner's consultants or contractors; <br />.5 . Preparing digital data for transmission to the Owner's consultants and contractors, or to other Owner <br />authorized recipients; <br />.6 Preparation of design and documentation for alternate bid or proposal requests proposed by the <br />Owner; <br />. 7 Preparation for, and attendance at, a public presentation, meeting or hearing; <br />.8 Preparation for, and attendance at a dispute resolution proceeding or legal proceeding, except where the <br />Architect is party thereto; <br />.9 Evaluation of the qualifications of bidders or persons providing proposals; <br />.10 Consultation concerning replacement of Work resulting from fire or other cause during construction; <br />or <br />. 11 Assistance to the Initial Decision Maker, if other than the Architect. <br />§ 4.3.2 To avoid delay in the Construction Phase, the Architect shall provide the following Additional Services, <br />notify the Owner with reasonable promptness, and explain the facts and circumstances giving rise to the need. If the <br />Owner subsequently determines that all or parts of those services are not required, the Owner shall give prompt <br />written notice to the Architect, and the Owner shall have no further obligation to compensate the Architect for those <br />services: <br />.1 Reviewing a Contractor's submittal out of sequence from the submittal schedule agreed to by the <br />Architect; <br />.2 Responding to the Contractor's requests for information that are not prepared in accordance with the <br />Contract Documents or where such information is available to the Contractor from a careful study <br />and comparison of the Contract Documents, field conditions, other Owner -provided information, <br />Contractor -prepared coordination drawings, or prior Project correspondence or documentation; <br />.3 Preparing Change Orders and Construction Change Directives that require evaluation of Contractor's <br />proposals and supporting data, or the preparation or revision of Instruments of Service; <br />.4 Evaluating an extensive number of Claims as the Initial Decision Maker; <br />.5 Evaluating substitutions proposed by the Owner or Contractor and making subsequent revisions to <br />Instruments of Service resulting therefrom; or <br />.6 To the extent the Architect's Basic Services are affected, providing Construction Phase Services 60 <br />days after (1) the date of Substantial Completion of the Work or (2) the anticipated date of Substantial <br />Completion identified in Initial Information, whichever is earlier. <br />§ 4.3.3 The Architect shall provide Construction Phase Services exceeding the limits set forth below as Additional <br />Services. When the limits below are reached, the Architect shall notify the Owner: <br />.1 Two (2 ) reviews of each Shop Drawing, Product Data item, sample and similar submittal of the <br />Contractor <br />.2 Six (6 ) visits to the site by the Architect over the duration of the Project during construction <br />.3 Two (2 ) inspections for any portion of the Work to determine whether such portion of the Work is <br />substantially complete in accordance with the requirements of the Contract Documents <br />.4 Two (2 ) inspections for any portion of the Work to determine final completion <br />§ 4.3.4 If the services covered by this Agreement have not been completed within twelve (12 ) months of the date <br />of this Agreement, through no fault of the Architect, extension of the Architect's services beyond that time shall be <br />compensated as Additional Services. <br />ARTICLE 5 OWNER'S RESPONSIBILITIES <br />§ 5.1 Unless otherwise provided for under this Agreement, the Owner shall provide information in a timely manner <br />regarding requirements for and limitations on the Project, including a written program which shall set forth the <br />Owner's objectives, schedule, constraints and criteria, including space requirements and relationships, flexibility, <br />expandability, special equipment, systems and site requirements. Within 15 days after receipt of a written request <br />from the Architect, the Owner shall furnish the requested information as necessary and relevant for the Architect to <br />evaluate, give notice of or enforce lien rights. <br />AIA Document B1017 — 2007 (formerly 8161 TM -1997). Copyright @ 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights <br />reserved. WARNING: This AIA'' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of <br />this AIA° Document, or any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible <br />under the law: This document was produced by AIA software at 10:10:07 on 07/02/2015 under Order No. 8583696391 which expires on 07/01/2016, and is not <br />for resale. <br />User Notes: . (3B9ADA20) <br />