My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/25/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 08/25/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:07:50 PM
Creation date
8/26/2015 9:38:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/25/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
593
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Init. <br />rights-of-way, financing, contingencies for changes in the Work or other costs that are the responsibility of the <br />Owner. <br />§ 6.2 The Owner's budget for the Cost of the Work is provided in Initial Information, and may be adjusted <br />throughout the Project as required under Sections 5.2, 6.4 and 6.5. Evaluations of the Owner's budget for the Cost of <br />the Work, the preliminary estimate of the Cost of the Work and updated estimates of the Cost of the Work prepared <br />by the Architect, represent the Architect's judgment as a design professional. It is recognized, however, that neither <br />the Architect nor the Owner has control over the cost of labor, materials or equipment; the Contractor's methods of <br />determining bid prices; or competitive bidding, market or negotiating conditions. Accordingly, the Architect cannot <br />and does not warrant or represent that bids or negotiated prices will not vary from the Owner's budget for the Cost <br />of the Work or from any estimate of the Cost of the Work or evaluation prepared or agreed to by the Architect. <br />§ 6.3 In preparing estimates of the Cost of Work, the Architect shall be permitted to include contingencies for <br />design, bidding and price escalation; to determine what materials, equipment, component systems and types of <br />construction are to be included in the Contract Documents; to make reasonable adjustments in the program and <br />scope of the Project; and to include in the Contract Documents alternate bids as may be necessary to adjust the <br />estimated Cost of the Work to meet the Owner's budget for the Cost of the Work. The Architect's estimate of the <br />Cost of the Work shall be based on current area, volume or similar conceptual estimating techniques. If the Owner <br />requests detailed cost estimating services, the Architect shall provide such services as an Additional Service under <br />Article 4. <br />§ 6.4 If the Bidding or Negotiation Phase has not commenced within 90 days after the Architect submits the <br />Construction Documents to the Owner, through no fault of the Architect, the Owner's budget for the Cost of the <br />Work shall be adjusted to reflect changes in the general level of prices in the applicable construction market. <br />§ 6.5 If at any time the Architect's estimate of the Cost of the Work exceeds the Owner's budget for the Cost of the <br />Work, the Architect shall make appropriate recommendations to the Owner to adjust the Project's size, quality or <br />budget for the Cost of the Work, and the Owner shall cooperate with the Architect in making such adjustments. <br />§ 6.6 If the Owner's budget for the Cost of the Work at the conclusion of the Construction Documents Phase <br />Services is exceeded by the lowest bona fide bid or negotiated proposal, the Owner shall <br />.1 give written approval of an increase in the budget for the Cost of the Work; <br />.2 authorize rebidding or renegotiating of the Project within a reasonable time; <br />.3 terminate in accordance with Section 9.5; <br />.4 in consultation with the Architect, revise the Project program, scope, or quality as required to reduce <br />the Cost of the Work; or <br />.5 implement any other mutually acceptable alternative. <br />§ 6.7 If the Owner chooses to proceed under Section 6.6.4, the Architect, without additional compensation, shall <br />modify the Construction Documents as necessary to comply with the Owner's budget for the Cost of the Work at the <br />conclusion of the Construction Documents Phase Services, or the budget as adjusted under Section 6.6.1. The <br />Architect's modification of the Construction Documents shall be the limit of the Architect's responsibility under this <br />Article 6. <br />ARTICLE 7 COPYRIGHTS AND LICENSES <br />§ 7.1 The Architect and the Owner warrant that in transmitting Instruments of Service, or any other information, the <br />transmitting party is the copyright owner of such information or has permission from the copyright owner to <br />transmit such information for its use on the Project. If the Owner and Architect intend to transmit Instruments of <br />Service or any other information or documentation in digital form, they shall endeavor to establish necessary <br />protocols governing such transmissions. <br />§ 7.2 The Architect and the Architect's consultants shall be deemed the authors and owners of their respective <br />Instruments of Service, including the Drawings and Specifications, and shall retain all common law, statutory and <br />other reserved rights, including copyrights. Submission or distribution of Instruments of Service to meet official <br />regulatory requirements or for similar purposes in connection with the Project is not to be construed as publication <br />in derogation of the reserved rights of the Architect and the Architect's consultants. <br />AIA Document B101 TM — 2007 (formerly B151"1 —1997). Copyright ®1974,1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights <br />reserved. WARNING: Ttils AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorised reproduction or distribution of <br />thils AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible <br />under the law: This document was produced by AIA software at 10:10:07 on 07/02/2015 under Order No. 8583696391 which expires on 07/01/2016, and is not <br />for resale. <br />User Notes: (3B9ADA20) <br />
The URL can be used to link to this page
Your browser does not support the video tag.