My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/25/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 08/25/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:07:50 PM
Creation date
8/26/2015 9:38:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/25/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
593
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The obligations of Contractor under this Section shall survive the <br />expiration or termination of the Contract. <br />12.1.1 Subparagraph; Line 4; After "Time" add "or Contract Sum". <br />12.2.14 Subparagraph; Line 1; After "Architect" add ", as incomplete, defective"; Line 3; <br />After "such" add "defective or otherwise" <br />12.2.2.1 Subparagraph; Line 2; After "of the" add "entire"; after "Work" delete "or <br />designated portion thereof, or after the date for commencement of warranties <br />established under Subparagraph 9.9.1,' ; add "(unless otherwise provided in any <br />Certificate of Partial Substantial Completion approved by the parties), or within <br />such longer period of time as may be prescribed by law or in equity,"; Line 4, After <br />"to be" add "defective or otherwise"; Line 6, After "condition." insert "by the <br />Owner."; delete the next sentences and add: <br />This corrective period shall be extended with respect to portions of <br />Work first performed after Substantial Completion by the period of <br />time between substantial Completion and the actual performance of <br />the Work. Corrective Work shall be warranted to be free from <br />defects for a period equal to the longer of six (6) months after the <br />completion of the corrective Work or one (1) year after the Date of <br />Substantial Completion (subject to extension as previously <br />described) or such longer period of time as may be prescribed by <br />law or in equity, or expiration of the term of any applicable special <br />warranty, if applicable, required by the Contract Documents. Any <br />defect in such Work shall be corrected again by Contractor promptly <br />upon notice of the defect from the Owner. This obligation under <br />this subparagraph 12.2.2.1 shall survive acceptance of the Work <br />under the Contract and termination of the Contract. <br />12.2.2.3 Subparagraph; delete in its entirety. <br />12.2.4 Subparagraph; Line 2; After "caused" add "in whole or in part"; and Line 3 After "is" add <br />"defective or otherwise". <br />12.2.5 Subparagraph; Line 2; After "Documents" delete the period and add "or under law or in <br />equity.", and delete "of one year". <br />12.3 Subparagraph; Line 1; After "is" add "defective or otherwise". <br />13.2.2 Subparagraph; Line 2; After "Project" add "or a Construction Manager." <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.